Create entry
World Encyclopedia  > category  >  Building Materials Encyclopedia   

Boya HotelGrouting small conduitStrengthen personal protection

release time: 2023-02-06 02:41:04

Advantages: It is connected with special hydraulic tongs, does not require preparations outside the construction site, does not require any equipment, is convenient and fast ( times faster than the traditional welding method), and is not affected by the bad weather.The bi-directional tensile plastic mesh false roof used in underground coal mine with mine grouting pipe is specially designed and manufactured for the false roof support of underground coal mining face and roadway wall support. It is made of several high molecular polymers and filled with other modifiers through heating, extrusion, molding, punching, stretching, shaping coiling and other processes. Compared with metal textile mesh and plastic woven mesh, it has light weight, high strength, isotropy, It is a new type of mesh grouting pipe material for underground coal mine support engineering and civil engineering.Boya Hotel,?Can the piston rod of the grouting pipe be protected to avoid being bruised and accelerating leakage?Answer: it varies according to the model and elasticity of the grouting pipe, and its internal pressure can reach bar or more.


Boya HotelGrouting small conduitStrengthen personal protection



At the same time, because the space in the grouting pipe restricts the lateral sliding and rolling of the soil particles inside, the relative displacement trend or relative displacement also occurs between this part of soil particles and adjacent soil particles, resulting in friction. This friction force is generally called 'bite force' or 'lateral force resistance'. The 'surface friction' and 'bite force' make the slip and roll of soil particles under the force of the upper limit line at the location of the grouting pipe, and limit the lateral displacement of soil in the whole plane of the grouting pipe. The grouting pipe plays an important role in the key points of settlement. Therefore it is reasonable to use the grouting pipe to treat the uneven settlement of fill excavation transition subgrade. This paper yzes the action mechanism of the grouting pipe according to its type and characteristics, and proposes a new technology of sprinkling a layer of filler in the grouting pipe network when paving the surface course. As a kind of road reinforcement material, grouting pipe is widely used in road maintenance engineering because of its advantages of simple, fast construction and low investment. Permanent sealing can be ensured after grouting. If there is no leakage, grouting can be omitted. The wellhead clamp head is connected to the lower clamp head of the drive head. Some driving of grouting pipe.Manufacturing cost,The glass fiber grouting pipe is a rigid product made of high-strength alkali free peeling fiber, which is made into a mesh base material through an internationally advanced fine knitting process and is surface coated. Unidirectional tensile plastic grouting pipe is a grouting pipe made of high-density polyethylene (HDPE) as raw material, plasticized and extruded plate, punched, heated and stretched, extruded and pressed, and then punched with regular hole network, and then stretched longitudinally. In this process, the polymer is in a directional linear state and forms an oblong reticular integral structure with uniform distribution and high node strength. The tensile strength and rigidity of the grouting pipe are fully improved through the reorientation of the originally scattered chain molecules into a linear state by stretching. The small editor of the grouting pipe reminds everyone that there should be no rust, water and other impurities when using the prestressed machinery. The working clip can be used after removing the foam in the packing box, and the grouting pipe should be properly kept. However,Boya HotelSmall conduit manufacturer, when the prestressed tendon is long and the grouting pipe needs to be tensioned repeatedly, it is suggested that a small amount of lubricant (e.g. anchor pulling spirit) be applied to the tapered hole of the anchor plate by the prestressed machine which is not only conducive to the follow-up and anchor pulling of the working clip, but also conducive to the multiple grouting of the grouting pipe; Apply lubricant on the outer surface of the tool clip and the inner and outer surfaces of the taper hole of the anchor plate before use, and regularly remove the debris on the clip surface to make the anchor flexible. However, when the clip is cracked or the tooth surface is damaged, it needs to be replaced and can not be used again. It has good flexibility. The pipes can be coiled when they are produced, so that the number of joints in the pipe network can be reduced. It can be laid according to the terrain, easily bypass obstacles, and is convenient for construction.


Boya HotelGrouting small conduitStrengthen personal protection



?Product survey, The wellhead clamp head is connected to the lower clamp head of the drive head. Some driving of grouting pipe.architectural engineering; Grouting technology can be divided into static pressure grouting and high-pressure jet grouting. However, according to the action mechanism of the slurry on the soil, the geological conditions, the grouting pressure, the movement form of the slurry and the alternative ways, the grouting technology can be divided into four categories: penetration grouting, split grouting compaction grouting and jet grouting.In the process of using the acoustic pipe, it is necessary to have a detailed understanding of its installation method, we should pay attention to the orientation of the installation hole. As long as the device is installed in a correct hole, the Jiangsu acoustic tube can be used normally in the process of application, and the service life of Jiangsu acoustic tube can be improved. This is also the most important factor in the process of application in the future. If the hole fault is bragged about in the process of the device, the resistance of Jiangsu acoustic pipe will appear in the process of application, resulting in its damage. There is a great relationship between the accuracy of the hole and the quality after construction. In the process of construction, it is necessary to use the device according to the planned paper so that it can be used normally and improve the quality of use.In the process of application, because there will be many Jiangsu acoustic measurement pipes in the process of construction. In this way, the phenomenon of uneven stress will be formed. In the process of application, the phenomena of conflict and unusable will be formed. In order to prevent the phenomenon of surrounding each other, it is necessary to pay attention to the method of the device in the process of the device, so that it can be used normally. The grouting pipe manufacturer introduced that the product quality of the grouting pipe is relatively stable, and when the mold is finalized, it is not easy to show defects. Most of the defects of the grouting pipe appeared in the trial production period, and most of them were formed due to the unreasonable planning structure of the mold. The grouting pipe manufacturer will briefly introduce the treatment methods of defects as follows: wrinkle appearance and treatment methods. The so-called wrinkle refers to that there is a convex edge on the circular arc surface of the grouting pipe, and there is a concave appearance on the adjacent side. This kind of wrinkle is mostly in the shape of sharp ridges, some of which are straight to the nozzle, and often occur symmetrically at both ends of the center line, in the shape of 'eight'. Chengdu grouting pipe manufacturers mostly occur on the inner arc surface and some occur on the outer arc surface.Boya Hotel,Grouting pipe grouting mainly improves the bearing capacity of piles from these two aspects Grouting is carried out through the grouting pipe embedded in the pile body. The slurry integrates the soil and slurry around the pile body through penetration, splitting and compaction, so as to improve the physical and mechanical properties of the bearing layer of the pile body Especially for the ballast at the bottom of the pile, grouting can improve or eliminate the adverse effect of the ballast at the bottom of the pile on the end bearing capacity through the replacement, compaction and consolidation of the ballast by the slurry.II During the drilling process of the bored pile, there will be a certain gap between the pile retaining wall and the surrounding soil layer, which will lead to the decrease of the pile side friction and affect the bearing capacity of the pile When the grouting pipe is used at the pile end for grouting, the slurry will permeate, fill and compact along the side of the pile under the pressure, so as to complete the replacement of the mud skin around the pile and the filling of the gap such as greatly improving the pile side friction resistanceIt is laid in the soil, and through the bite and interlock between the grouting pipe mesh and the soil, it forms an efficient stress transmission mechanism, so that the local load can quickly and effectively spread to the large area of soil, so as to reduce the local failure stress and improve the service life of the project. The convex joint steel plastic grouting pipe is an upgraded product of the ordinary steel plastic grouting pipe, which changes the shortcomings of the ordinary grouting pipe, such as the small peeling force of the joint (n), the easy cracking of the welding point, the difficulty of construction, and the reduction of the role of side displacement prevention. Due to the change of material ratio and construction technology,Boya HotelPrice of advanced small conduit, the peeling force of the welding joint is between N and N, it is called convex joint steel plastic grouting pipe, and its academic name is node reinforced steel plastic grouting pipe. The steel plastic grouting pipe is made of high-strength steel wire (or other fibers) through special treatment,Boya HotelAdvanced small conduit factory, polyethylene (PE) and other additives, and is extruded to form a composite high-strength tensile strip. If the surface is rough embossed, it is a high-strength reinforced geotextile. This single belt is woven or sandwiched at a certain distance longitudinally and horizontally, and is formed by welding its junction with the fusion welding technology of special reinforcement bonding. The grouting pipe is set out from the inner ring tap in the vertical setting out state, and the drawn out pipe forms a spring shape and stretches automatically. Takeout direction: the spiral direction of the spring shape after takeout is consistent with the twisting direction of, otherwise fried dough twist or disorder will occur.Appropriate measures shall be taken to prevent surface water, curing water and garbage from falling in. When necessary, a sump shall be set near the post cast strip of the base plate in combination with the design of the basement plane drainage system to facilitate the final cleaning before the grouting pipe is cast. When advance water stop is not used, a sump shall be set, which can be set in the basement according to the above method, or set outdoors as a temporary facility. Usually, we use the waterproof scheme between the grouting pipe and the water surface or before, and there are many methods for the grouting pipe to stop water in advance. It should be noted that the design unit should participate in the review of the construction organization design of the basement, so as to determine a complete implementation scheme of advanced water stop before the excavation of the foundation pit and the pouring of the cushion. Otherwise, the design modification requirements will be put forward only when problems are found in advance water stop during construction, which will affect the integrity and rationality of the whole water stop scheme.


Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms