San Miguel chicaReactance transformerOn-site management method of workshop
release time: 2022-12-04 02:57:29
Insulation and heat removal are different. Dry type transformers are generally insulated with epoxy resin, cooled by natural air and large capacity by centrifugal fan. Oil immersed transformers are insulated by insulating oil, insulated by insulating oil in the circulating system inside the transformer,San Miguel chicaOil immersed transformer refueling video, and heat is discharged on the radiator (radiator) of the circulating system inside the transformer.The step-up dry-type transformer refers to the instantaneous operation of voltage. At this stage, there are few manufacturers of dry-type transformer that can reasonably guarantee the instantaneous step-up in China. The step-up dry-type transformer has strong step-up capacity and good practical effect. The difference depends on that the transformer power switch without excitation regulator does not have the ability to change gear with load. Because this kind of tap power switch can cut off the whole process in a short time during the whole process of gear change cutting off the load current will cause arc burning between circuit breakers, tap power on and off or short circuit fault,San Miguel chicaTransformer distribution equipment,San Miguel chicaPower transformer installation picture, it is generally used as a dry-type transformer that is not very strict in voltage regulation and does not need to be adjusted frequently.Brief introduction of zero line of power transformerGood quality,The key reason for oil leakage is that there are defects in cast iron partsDry type transformerIf the volume of power transformer is too small, the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore, which is not suitable for too large or too small.
When sampling in bulk gasoline barrels, samples shall be selected according to % of the number of gasoline barrels, but not less than barrels. When sampling in batches of small and medium-sized pails or bottles, samples shall be taken according to % of the total number of barrels (bottles).Which one is better,The key reason for oil leakage is that there are defects in cast iron partsPrecautions for trial operation of power transformer manufacturersAfter no-load test run is normal for h, it can be transferred to on-load operation, and the load shall be gradually increased from %, % and % by grade.San Miguel chica,Before no-load impact closing, the pose period of overcurrent protection shall be set to zero, and the data signal circuit of steam vehicle relay shall be temporarily connected to the pull-in circuit.Oil immersed transformer operationAfter tightening the loose bolts, seal the flange, and solve the bolts that are likely to leak, so as to achieve the goal of complete treatment. Tighten the loose bolts strictly according to the actual operation and processing technology.
Attachment list
The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.
If you think this entry needs to be improved, please edit
Previous MastyVehicle thermal insulation bagRequirements for wall structure Next Lovich30x30 stainless steel square pipeHow long can the cold winter of construction machinery industry last