Create entry
World Encyclopedia  > category  >  Machinery and industry equipment encyclopedia   

HeimMechanical hydraulic lifting platformWhat are the specific installation steps

release time: 2024-04-26 06:18:57

According to the performance of the equipment, aluminum alloy lifting platforms are generally divided into the following categories: mobile aluminum alloy lifting platforms: the equipment uses high-strength aluminum alloy materials, greatly reducing the deflection of the lifting platform. Small size, capable of lifting and lowering operations in a relatively small space. At the same time, the lightweight and flexible model can move and operate a fixed aluminum alloy lifting platform: High strength aluminum alloy plates are generally used in the market, and the design process is more user-friendly and meticulous. The equipment can be customized according to the actual use situation, and the size and load increase of the table can greatly meet the diverse needs of customers.When working in a hot environment, pay attention to heat dissipation.Heim,It is necessary to regularly inspect the brake of the guide rail type cargo elevator, it is necessary to clear the oil circuit or replace the grease nipple until butter can be added. Otherwise it should be ensured to add butter twice to the transmission position where the grease nipple is located. For areas where butter cannot be added, it is prohibited to use the equipment.Zaprejic,The main categories of aluminum alloy elevators in the Chinese market are based on the structural form of aluminum alloy elevators. Aluminum alloy lifting platforms can be divided into the following types: single column aluminum alloy lifting platforms, which are lightweight and flexible in movement,Check the hydraulic oil quality and level. When the lifting platform is raised to a high position, the hydraulic oil level should be - millimeters higher than the bottom of the oil tank. When the color of the hydraulic oil darkens, the oil becomes sticky, or there are foreign objects such as gravel in the oil the hydraulic oil should be replaced in a timely manner. The hydraulic system of the lifting platform should be checked for hydraulic and pipeline connections. If the pipeline is damaged, it should be replaced immediately; When there is looseness in the connection part, tighten the pipe joint.Before using the machine, the staff should carefully inspect the hydraulic and electrical systems to ensure that there are no leaks or bare leaks before use.


HeimMechanical hydraulic lifting platformWhat are the specific installation steps



Novice operators: Due to their lack of understanding or lack of understanding of the operation methods of high-altitude work platforms such as mobile elevators, it is easy for them to make mistakes and cause equipment malfunctions. Operators in this area need to patiently learn and pass training before they can operate and use them.Hydraulic lifting platforms are widely used in factory maintenance, municipal construction, and decoration of hotels in industrial and mining enterprises, with reliable quality and perfect performance.High altitude work requires the use of tool bags, and heavier and larger high-altitude work tools should be hung on stable components and cannot be placed randomly to avoid the occurrence of high-altitude falling accidents.Statistics,Remove and disassemble the hydraulic lift cargo elevator lowering valve, blow out the plunger with compressed air, then install it and reinstall it.Remove and disassemble the hydraulic lift cargo elevator lowering valve, blow out the plunger with compressed air, then install it and reinstall it.The equipment operation is very simple, just press the operation button, and the height adjustment board of the equipment will automatically rise; Release the button, adjust the weight of the plate to fall, and the tongue plate can be used by placing it on the truck.


HeimMechanical hydraulic lifting platformWhat are the specific installation steps



Maintain a smooth access road for external construction elevators and sufficient parking space for equipment. When using a crane for auxiliary installation, full consideration should be given to whether the on-site environment meets the operating conditions of the crane.Fair price,HeimMobile hydraulic lifting platform/lifting platform,The hook of the seat belt should not be hung on unstable or moving objects. High priced and various specifications of scissor lift manufacturers provide timely supply, with high cost-effectiveness, and have become the preferred brand for many wire products. Welcome to purchase!Aging and deterioration of hydraulic oil; The solution is to replace the hydraulic oil.Avoid, especially during storage. Store in a cool and dry place, and avoid rainy and snowy weather during work.Heim,Each department's electric brush should be kept clean, efficiency,HeimIndoor fixed hydraulic lifting platform,HeimMobile hydraulic lifting platform, and usable area of electric elevators, most high-rise buildings will divide electric elevators into arrays, with each group responsible for a portion of the floors, and make different adjustments and scheduling based on the usage mode of different floors at different times.What are the installation precautions for elevators? The folding fence and cage of the elevator should be cleaned of the foundation surface, and the foundation bolts should be installed properly. If the construction elevator is installed on the floor, a pad iron must be used below the screws to increase the force surface between the nuts and the floor to reduce the impact of the nuts on the floor; Insert steel plate shims of different thicknesses between the chassis and the foundation stone at the anchor bolts to adjust the verticality of the guide rail frame; Install three standard sections and measure the verticality of the guide rail frame using a theodolite to ensure the verticality of each main pipe in both directions. After adjusting the verticality of the guide rail frame, tighten the four foundation bolts; Adjust the verticality of the fence door frame as above and tighten the remaining anchor bolts; Install the buffer spring; Connect the other half of the fence to the front half with bolts; Adjust the verticality and tighten the anchor bolts as above, first install the suspension cage before installing the drive plate).


Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms