Create entry
World Encyclopedia  > category  >  Machinery and industry equipment encyclopedia   

Mezek WadeTractive mobile elevatorEconomy gradually moves closer to digital

release time: 2024-04-28 07:59:19

Leakage occurs due to looseness, vibration, and the influence of heat on the sealing surface and pipe joints of the machine; Some casting, processing and other defects are difficult to detect during assembly and debugging, but due to vibration and impact during the operation process,Mezek WadeMobile boarding bridge, these defects are exposed, manifested as oil (water) leakage. Therefore, leakage is prone to occur during the running-in period. Poor, oil (grease) is not easy to form a uniform oil film on the friction surface to prevent wear. This reduces efficiency and causes early abnormal wear of the components. In severe cases, it can cause scratches or bite on the friction surface of precision fitting, leading to the occurrence of faults.Manganese steel is generally used as the primary profile for warehouse cargo elevators. In order to achieve better anti-corrosion effect, a layer of rust resistant primer is usually applied, which effectively blocks air and prevents premature corrosion of the steel. Below, Ruilong hydraulic press will explain the role of rust resistant primer.Mezek Wade,Folding arm lifting platform product features Folding arm lifting platform High altitude operation platform degree rotation without external power supply can work across obstacles, lifting smoothly and safely. The curved arm lifting platform adopts a curved arm working arm, and the scope and space of operation are not affected.The lifting stage can provide real-time information on the operation of the entire vehicle avoiding relying solely on the experience of operators to coordinate with each other, and improving the reliability and safety of the system. The definition of safety zone is very important because the lifting stage has a large range of movements, the ground turntable and the high-altitude work bar. However, for various movements on the vehicle, it is also an interconnected system, which needs to consider the priority of operation, system redundancy, and safety assurance of actions.Modena,After cleaning, and carefully inspect the steel structure, safety protection devices, electrical devices, and transmission devices of construction elevatorsEnsure that the small gear and pressure wheel are securely fastened on the drive base plate, and check the fixing condition of the drive base plate bolts


Mezek WadeTractive mobile elevatorEconomy gradually moves closer to digital



Many times, after installing hydraulic cargo elevators in factories, floors, docks, and other places, there may be some adverse reactions and problems in the early stage. Below, Yakali's editor summarizes some common problems with hydraulic cargo elevators and provides some statements on how to solve and prevent these problems.The second method is the protective layer method, which covers the metal surface of the aluminum alloy lifting platform with a protective layer to isolate the metal products from the surrounding corrosive medium and prevent corrosion. Apply engine oil, petroleum jelly, paint, or cover the surface of steel parts with corrosion-resistant non-metallic materials such as enamel and plastic; It is not easy to apply a layer of electroplating, hot plating, spray plating, etc. on the surface of steelWeekly maintenance: According to the operation instructions,Check the smooth steel wire rope and various fasteners, if there is excessive wear, it is necessary to replace themClean and inspect the crown wheel frame assembly, correct or replace with new partsHow to maintain and maintain the stage? When using the lifting stage in daily life, attention should be paid to maintenance to extend its lifespan. Below, Jinan Dasheng Hydraulic Machinery will introduce several maintenance and attention points for everyone: the brakes of each mechanism should be regularly inspected and adjusted for the clearance between the brake pads and wheels to ensure flexibility and reliability. On the friction surface, there should be no dirt present, and any dirt must be washed off with gasoline or thinner. Pay attention to checking each steel wire rope for broken wires and loose strands. If it exceeds the relevant regulations, it must be replaced immediately. Professional elevator manufacturers have a complete range of products, which are popular both domestically and internationally. Our equipment has a long service life! The industry leader in product wire products, welcome to inquire


Mezek WadeTractive mobile elevatorEconomy gradually moves closer to digital



Check the oil level of the gearbox and make up for new oil if necessaryPrice,Regarding the construction elevator with counterweight, check the adjustment and fixation status of the counterweight guide wheel. Check the balancing equipment of the steel wire rope,Mezek WadeProfessional aluminum alloy lifting platform, the crown wheel, and the counterweight steel wire rope bracketHowever, large welded structural components have the characteristics of complex morphology, large differences in residual stress size and distribution, and it is difficult to achieve good results using ordinary vibration aging technology. Therefore, it is crucial to develop a reasonable process. Therefore they found Nanjing Juhang and our JH- vibration aging equipment, a layer of rust resistant primer is usually applied and requested us to develop a complete vibration aging process.Manganese steel is generally used as the primary profile for warehouse cargo elevators. In order to achieve better anti-corrosion effect, which effectively blocks air and prevents premature corrosion of the steel. Below, Ruilong hydraulic press will explain the role of rust resistant primer.Mezek Wade,A non scissor type hydraulic lifting mechanical equipment used for transporting goods between floors of industrial factories, restaurants, and restaurants on the second and third floors. Professional elevator manufacturers are safe, environmentally friendly, and economical! Our products are exported to foreign countries and highly trustedMonthly maintenance: View weekly inspection itemsCheck the fastening status of the wall bracket, support rod, and bolts and retaining rings between the lifting cargo elevator and the bridge. If they are loose or displaced, they should be checked and tightened


Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms