Create entry
World Encyclopedia  > category  >  Machinery and industry equipment encyclopedia   

OrolaniStage lifting platformMarket supply and demand are in a weak balance

release time: 2024-03-29 10:22:09

The call button on each floor is no longer working, and the call is cut off.For escalators that require intermediate support, it is necessary to determine whether the site has the conditions for adding support, as well as the range of support that can be added, the height and load size of the equipment and support platform, and other parameters.Orolani,The braking system of the elevator is usually closed, and only when it needs to be turned on, will the power turn on the brakes. So as soon as there was a power outage, the brakes closed and the elevator was braked in mid air. When the elevator descends abnormally, cut off the power and the elevatorThe effective support width of the upper and lower support beams should be greater than the width of the escalator truss, and there should be embedded steel plates.Pirot,For escalators that require intermediate support, it is necessary to determine whether the site has the conditions for adding support, as well as the range of support that can be added, the height and load size of the equipment and support platform and other parameters.The treatment of general civil engineering problems on escalator sites: the beam edge distance is too large: in this case, or both platforms can be extended simultaneously. The total extension of the upper and lower platforms should generally not exceed mm. When lengthening the platform, attention should be paid to the length of the pit or the opening of the floor slab, which should also be lengthened at the same time. After the escalator is extended, the force on the upper and lower support points will also increase. If the edge distance of the beam increases too long, support needs to be added in the middle of the escalator truss. In addition, changing the angle of the escalator from degrees to degrees can also make the beam edge distance longer.The mechanical components of the elevator's traction machine require oil. There are two scales on the outer cover of the traction machine. Open the oil nozzle to check that the oil should be in the middle of the two scales. If the oil is lower than the lower scale, it means that the traction machine should be refueled. If not refueled, the elevator will not operate well for a long time, leading to the burning of the elevator traction machine and motor. After the elevator has been running for a long time,OrolaniAluminum alloy double column lifting platform, the oil should be replaced in a timely manner to keep the traction machine clean and in good condition.


OrolaniStage lifting platformMarket supply and demand are in a weak balance



Attention: The elevator consists of two main parts: mechanical and electrical. If the elevator is not maintained on a daily basis, its safety cannot be guaranteed. If the elevator needs to be refueled without refueling, it will cause wear and tear on the mechanical components of the elevator greatly shortening its service life and preventing normal use of the elevator.The elevator suddenly opens the door and does not move after leveling, but automatically resumes operation after a few minutes: The elevator (escalator) has been running for too long, and the motor overheats. To prevent burning out, the motor cools down and automatically resumes operation.Tower style residential buildings above; Residential units and corridors with twelve or more floors; Other Class II public buildings with a building height exceeding meters; High rise buildings with elevators exceeding meters in height; The functional fire elevator has a front room. The area of the independent fire elevator front room is: the front room area of the residential building is greater than square meters; The front room area of public buildings and high-rise factory (warehouse) buildings is greater than square meters. When the front room of the fire elevator is shared with the smoke proof staircase, its area is: the area of the shared front room in residential buildings is greater than square meters, and the area of the shared front room in public buildings and high-rise factory (warehouse) buildings is greater than square meters.Latest consultation,The call button on each floor is no longer working, and the call is cut off.The safety monitoring machine room environment screen cabinet main power switch traction wheel speed limiter shaft and pit guide rail layer door and car counterweight should be reliably fixed with pressure plates to prevent loosening.There are dedicated operation buttons for firefighters at appropriate positions at the entrance of the first floor elevator. The operation buttons are generally protected by glass sheets and have a red&# quo; mark in place; Dedicated to fire protection; Words such as.


OrolaniStage lifting platformMarket supply and demand are in a weak balance



The requirement for the shaft is that it should not be plastered which is beneficial for reducing noise, but there should be no protruding foreign objects.Quotation sheet,  “& rdquo; Elevator shaft: The design conditions are provided by the user to the architectural design department. The architectural design department analyzes whether the on-site pit depth, reaction force, etc. can meet the installation requirements of the elevator, as well as which building structures are needed (such as smashing stairs or floors), and develops a renovation construction plan. If it is indeed necessary to change the elevator structure due to civil engineering conditions (such as car size,OrolaniHydraulic fully automatic plate rolling machine, door opening width, etc.), then consider the non-standard design of the elevator.The gantry elevator is used in the door legs of large gantry cranes to transport workers and maintenance components inside the gantry craneb. When the old elevator cannot start: due to the inability to enter the shaft, limited data can only be obtained from outside the shaft to determine whether it is non-standard (if there is a high platform in the machine room, the plane size of the shaft can be measured in the machine room, but it is not accurate enough) for elevator quotation negotiation reference. In this case, the signing of the contract should state that the shaft rectification and costs are the responsibility of the user. For uncertain shaft structures and dimensions, users should be reminded to provide them to the elevator after the old elevator or notify the elevator to take measurements before the new elevator is put into operation.Orolani,The basic content of escalator shaft measurement is to measure the lifting height. The same as measuring the height of a straight ladder, strictly speaking, the lifting height of a ladder is the vertical distance between the finished ground at the upper and lower support beams. When using the suspension line method to measure, attention should be paid to whether there is a drop between the positioning point of the line drop and the decoration surface of the lower support beam of the ladder.The call button on each floor is no longer working, and the call is cut off.  “& rdquo; Elevator shaft: The design conditions are provided by the user to the architectural design department. The architectural design department analyzes whether the on-site pit depth, top floor height, etc. can meet the installation requirements of the elevator, as well as which building structures are needed (such as smashing stairs or floors), and develops a renovation construction plan. If it is indeed necessary to change the elevator structure due to civil engineering conditions (such as car size, door opening width, etc.) then consider the non-standard design of the elevator.


Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

If you think this entry needs to be improved, please edit

Previous LipetskLarge cloth bagAnalytical use problem    Next Lamar1.5 ton fixed lifting platformTurbulent operation

Synonym

No synonyms