Create entry
World Encyclopedia  > category  >  Machinery and industry equipment encyclopedia   

HamTheater stage lifting platformWhat issues should be paid attention to in the season

release time: 2024-03-29 12:14:07

The household must make two steel splints above the entrance. The position and size of the clamp plate are determined based on the selected door machine model.The call button on each floor is no longer working, and the call is cut off.Ham,Elevators are used to transport firefighters, passengers and fire-fighting equipment in the event of a fire. They are used to transport frozen goods in large cold storage or refrigeration workshops. However,Ham3-story small household elevator, they need to meet the requirements of sealing the door leaves and guide rails at the moving parts. Professional household elevators villa household elevators,HamPrice of 5-story household elevator, household elevator manufacturers, and small household elevators have stable, safe, reliable, and maintenance free performance, and their technical level has reached the domestic level, Meet the advanced level of international similar products and immersion requirementsThe household must make two steel splints above the entrance. The position and size of the clamp plate are determined based on the selected door machine model.Baden,Attention: The elevator consists of two main parts: mechanical and electrical. If the elevator is not maintained on a daily basis, it will cause wear and tear on the mechanical components of the elevator, greatly shortening its service life and preventing normal use of the elevator.Electrical components are roughly divided into screens, electrical switches for each safety circuit, etc. It is the brain of the elevator and the central nervous system of the elevator. The movement operation, and door opening and closing of the elevator are all controlled by it, so it must be treated as a top priority in daily maintenance work. Do not short circuit the elevator circuit inside the screen during work. When the elevator door system malfunctions, someone shorts the elevator door for convenience in order to find the fault. This is very dangerous, and there are many accidents when shorting the door. Why? If a person opens the hall door and extends their head inward, the elevator happens to run up or down to this point, and the hall door is shorted, the elevator cannot stop, so an accident is highly likely to occur. So in our daily maintenance work, we must not short-circuit the safety circuit. If it is necessary to short-circuit, we must identify which safety component has a problem and which safety component needs to be shorted. Moreover, after maintenance or urgent repairs are completed, we must promptly remove the short-circuit wire. Professional household elevator manufacturer, with a large quantity and excellent quality at a reasonable price. It is fire-resistant, waterproof, high-temperature resistant, sturdy and durable, safe and reliableIn the event of a fire, when instructed by the fire center or the dedicated operation button of the first floor firefighter to enter the firefighting state, the elevator should immediately stop on the floor without opening the door, return to the first floor station, and if they are overweight, they will alarm and generally cannot be started. Most passengers can also voluntarily exit.b. When the old elevator cannot start: due to the inability to enter the shaft, limited data can only be obtained from outside the shaft to determine whether it is non-standard (if there is a high platform in the machine room, the plane size of the shaft can be measured in the machine room, but it is not accurate enough) for elevator quotation negotiation reference. In this case, the signing of the contract should state that the shaft rectification and costs are the responsibility of the user. For uncertain shaft structures and dimensions, users should be reminded to provide them to the elevator after the old elevator or notify the elevator to take measurements before the new elevator is put into operation.Marketing Department,The basic content of escalator shaft measurement is to measure the lifting height. The same as measuring the height of a straight ladder, strictly speaking, attention should be paid to whether there is a drop between the positioning point of the line drop and the decoration surface of the lower support beam of the ladder.The door closing button has no self maintenance function. During the designated maintenance period, the elevator components in operation are inspected, refueled, dust is removed, and safety devices are debugged. Including non-destructive testing and maintenance of elevator traction steel wire ropes.Measure the beam edge distance between the upper and lower support beams. The measurement is to suspend the line from the upper support point to the ground for positioning, and then measure the horizontal distance from the positioning point to the edge of the lower support beam.


HamTheater stage lifting platformWhat issues should be paid attention to in the season



The treatment of general civil engineering problems on escalator sites: the beam edge distance is too large: in this case, the length of the upper and lower platforms of the escalator can be increased to meet the actual dimensions of civil engineering. One platform can be extended on one side, or both platforms can be extended simultaneously. The total extension of the upper and lower platforms should generally not exceed mm. When lengthening the platform, attention should be paid to the length of the pit or the opening of the floor slab, which should also be lengthened at the same time. After the escalator is extended, the force on the upper and lower support points will also increase. If the edge distance of the beam increases too long, support needs to be added in the middle of the escalator truss. In addition,HamAluminum alloy double column lifting platform, changing the angle of the escalator from degrees to degrees can also make the beam edge distance longer.The cost is reasonableThe call button on each floor is no longer working, and the call is cut off.Mine elevators are used for transporting personnel and goods in mines. Special elevators are designed for special environmental conditions, such as explosion-proof, anti-corrosion, and heat-resistant elevatorsThe shaft for updating the old elevator: The measurement of the shaft for the old elevator is the same as the shaft that has just been constructed. When the old elevator is not yet in use, try to obtain relevant data outside the shaft, such as the size of the machine room, floor height, the elevator technician must cooperate in measuring the shaft! And be sure to pay attention to safety! The elevator technician opens the hall door on the first floor and initiates maintenance operations to drive the car above the second floor. The measurement personnel open the floor door on the first floor to measure the pit data, paying attention to recording the pit size and the wall structure of the first floor, such as whether the hall door is centered, whether there are brackets, whether there are special structures on the shaft wall, the spacing between ring beams, and the position of embedded parts. Then, the measuring personnel and elevator technicians take the elevator to the top floor. After measuring the machine room, the measuring personnel, with the cooperation of the technicians, go up to the car roof and start the elevator at a maintenance speed. When the car roof is slightly lower than the sill of the second floor hall door, the parking lot stops. During this process, the measuring personnel observe and measure the full travel of the shaft from the top floor, mainly the height of the floor, while recording the measurement (safety must be paid attention to, and special attention should be paid to moving parts such as counterweights and wire ropes).Ham, reaction force, etc. can meet the installation requirements of the elevator, as well as which building structures are needed (such as smashing stairs or floors), and develops a renovation construction plan. If it is indeed necessary to change the elevator structure due to civil engineering conditions (such as car size, door opening width etc.), then consider the non-standard design of the elevator.During the use of elevators, some elevator users seek temporary workers or unqualified companies for elevator maintenance in order to reduce costs and save funds. Once safety issues arise, even the responsible unit cannot be found. If the maintenance is carried out by elevator manufacturers or qualified professional companies, on the one hand, the maintenance technology and quality are guaranteed, and on the other hand, if any problems occur, someone is also responsible.


Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms