Sintra500 KVA dry type transformerQuality inspection method

release time: 2024-04-24 05:38:15

The technical specification of power consumption requires that the resistance of maintenance grounding wire shall be ≤ Ω, According to Ohm's law, when the insulating layer is damaged, the current is only / of the total current flow, so as to play a guarantee effect. The higher the voltage,SintraOil immersed distribution transformer, the smaller the resistance in other words,SintraType of dry-type transformer, in the case of high voltage. We can care about the power transformer plant and master a lot of professional knowledge.Power transformer manufacturerSintra,Dry type transformer, a static electrical equipment, is used to change the AC current (current) of a certain standard value into another or several types of working voltage (current) with the same frequency and different standard values. According to the supervision sampling inspection data of the third quarter of last year released by AQSIQ, among the kinds of dry-type transformer commodities manufactured by manufacturers in provinces and municipal districts across the country, kinds of commodities were found to be inconsistent with the provisions of relevant specifications,The vibration reduction of the grounding device sheet solves the problem of modifying the fixed hard connection between the copper sheet of the grounding device and the dry-type transformer. The original oscillation of the dry-type transformer will be transmitted to the metal in the concrete by the baffle and cause low-frequency noise. Therefore, it must also be changed to produce flexible connection.How to reduce the failure of dry-type transformer?& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by V megger, the resistance value exceeds m ohm bus.


Sintra500 KVA dry type transformerQuality inspection method



According to the condition of cracks, galvanized iron wire can be punched into the leakage or riveted with hammer. Then clean the leakage point with toluene and seal it with raw materials. Coated sand casting eyes can be sealed with raw materials immediately.Power transformer is indispensable for power stations and substations, but we must pay attention to many problems in the whole process of applying power transformer.The heat discharge pipe of heat pipe radiator is generally made of slotted seamless steel pipe after flattening by stamping die. When the heat discharge pipe is bent and welded by electric welding, oil leakage is often caused. This is due to the supporting force on the surface of the pipe and the working pressure on the inner cavity when stamping the heat discharge pipe.Product line,It will also produce many faults, effectively deal with various faults of oil immersed transformer, make full use of the performance indicators and advantages of oil immersed transformer, and continuously improve the safety factor of oil immersed transformer. Ignition is a common fault of oil immersed transformer. The key fault of oil immersed transformer is short-circuit fault and short-circuit fault is more general.Oil leakage at electric welding positionIf you want to check the activated carbon fiber for the hanging cover, first take out the low-voltage waterproof sleeve and the on load transformer power switch, then lower the bell cover anchor bolt of the large cover, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, wear round steel from top to bottom in the surrounding screw holes, and count the spacing and specifications for easy reinstallation. At the same time, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for mm, stop the lifting, stabilize the bell cover, and check the bearing capacity of the lifting core, center of gravity and Jack. After everything is normal, lift it again until the bell cover exceeds the relative height of the body, and rotate the crane to place the bell cover on the clean skid.


Sintra500 KVA dry type transformerQuality inspection method



When the manufacturer of the power transformer samples from the automobile oil tank, after opening the sealing cover, use the cleaned and dried rubber stopper to the oil. At the same time, clamp the branch pipe with your thumb,Total quality assurance,Insulation and heat removal are different. Dry type transformers are generally insulated with epoxy resin, cooled by natural air and large capacity by centrifugal fan. Oil immersed transformers are insulated by insulating oil, insulated by insulating oil in the circulating system inside the transformer and heat is discharged on the radiator (radiator) of the circulating system inside the transformer.Step up process of dry-type transformer?The flange surface is uneven, the tightening bolts are loose, and the installation and processing process is wrong,SintraPower transformer price: 1000KVA, so that the bolts are not tightened well, resulting in oil leakage.Sintra,Difference between dry-type transformer and oil immersed transformer:The scientific research of power transformer oil is generally carried out according to the way of sampling. What are the common sampling methods and processes?In relay protection dry-type transformer, the disconnection of the fault point is related to each other. In a word, if there is any problem at a certain point, it will affect the whole power circuit