Create entry
World Encyclopedia  > category  >  Building Materials Encyclopedia   

Lv LiangGuide rail type cargo elevatorWhat aspects should be paid attention to when purchasing

release time: 2024-04-25 08:22:30

Secondly, there must be no dirt on the friction surface. If there is dirt, it needs to be washed off with gasoline or thinner; the gear box, gearbox, external gear and other parts of the equipment and the hydraulic oil must be in accordance with the requirements in the table; Correctly maintain the hydraulic guide rail lift. Regularly check whether the wire ropes in each part are broken or loose. If this phenomenon is found, replace them in time. If there is any looseness, it should be tightened in time. The connecting bolts of the equipment should be checked for tightness when the body is under pressure. All connecting shafts should be equipped with cotter pins; check whether each mechanism is operating normally, whether there is noise or failure , to eliminate all faults in a timely manner; when installing, dismantling and adjusting the slewing mechanism of the equipment, it is necessary to pay attention to the parallelism between the reducer and the center line of the gear, and the appropriate meshing gap; conduct a comprehensive inspection of the equipment regularly, whether the wires and cables are If there is damage, whether the motor is overheated, replace it in time and continue to run after troubleshooting; ensure that the bearings of the motor, each box, distribution box and brushes must be kept clean, and the travel switch points of each safety device must be safe and reliable.The contact opening and closing of the travel switch of each safety device must be reliable, and the contact arc crater should be polished in time.Lv Liang,After the elevator enters winter,Lv Liang2 ton cargo elevator, it is prone to some minor problems and glitches. This requires the user to perform maintenance and maintenance on the elevator in winter. The following editor will briefly introduce the winter maintenance precautions and key points of the elevator.The safety device of the guide rail hydraulic lifting platform The mechanical part of the guide rail hydraulic lifting platform mainly includes the hydraulic system and the mechanical device.Camana,What kind of function can be achieved by installing the elevator? Before installation, confirm whether the motor and the elevator are intact, and strictly check whether the dimensions of the parts connected to the motor and the elevator match. Here are the dimensions of the positioning boss of the motor the input shaft and the groove of the elevator. Fitting tolerances.What is the new price of fixed lifts? Fixed lifts are currently very popular in the market. Due to different manufacturers, different materials, different rated loads, and different brand awareness, the prices are also different. The current price of fixed lifts produced in the domestic market: rated load - tons, height of meters, table size mm *mm, the price is about - yuan; the rated load is - tons, the height is meters, the table size is mm*mm, the price is about yuan. Rated load, table size of each fixed liftDifferent. (Specific bearing capacity and rising height can be customized according to user requirements)Regular maintenance Regularly check whether the circuit system of the hydraulic lifting platform is loose and check whether the wires and cables are aging and damaged, which may cause leakage of the line. If there is it should be repaired in time to avoid electric shock.


Lv LiangGuide rail type cargo elevatorWhat aspects should be paid attention to when purchasing



It is strictly forbidden to switch the electric control switch with wet hands. Many people tend to ignore this detail. Although the safety voltage of the hydraulic lifting platform is below V, if you touch the power supply with your hands, or electric shock accidents in severe cases.Always check all wires and cables for damage.The scissor-type fixed lifting platform is a kind of transportation and handling equipment for transporting goods from a certain height to another height. After the operation is completed, the platform is level with the ground, does not occupy the ground space, and does not affect the passageway.how, a certain floor in the warehouse needs to be lifted to send goods or personnel into the designated warehouse.The wrong connection of the motor of the elevator When a coil, coil group or one-phase winding is reversed, it will cause a serious imbalance in the three-phase current and cause the winding to overheat.In the construction elevator, the switch box also has leakage protection equipment. Its wires and cables are well insulated, without leakage, and the metal threaded is not rusted,Lv LiangHydraulic lifting cargo elevator, and its damage is close to zero. His steel wire rope should comply with the corresponding configuration requirements, and there is no problem of broken strands and diameter reduction. Of course, the number of broken wires should not exceed the corresponding standard. His pulley movement is very flexible.


Lv LiangGuide rail type cargo elevatorWhat aspects should be paid attention to when purchasing



The parts such as reduction box, gearbox, external gear and hydraulic oil are all in accordance with the requirements in the table.technical service,The water cooling of the hydraulic station is generally tube-type water cooling, while its air-cooled elevator is carried out by using an air cooler, and it is The heat transfer capacity is calculated according to the heat load, and then the type selection calculation is carried out under the condition that the flow rate can be satisfied. Therefore, Long-term cooperation and there is a big difference. Long-term promotion of freight elevator factories and other, mutual benefit and win-win. If you choose the wrong supplier, you will be overwhelmed with all kinds of after-sales troubles in the later stage. Recently, I have seen many netizens report the problem of very loud oil cylinders. Today, the editor will simply popularize the knowledge for everyone.Install two more standard sections. Use the theodolite to check and adjust the verticality of the guide rail frame so that the errors in two mutually perpendicular directions meet the requirements in Table . The above two parts are about the precautions for the installation of the elevator. If your work involves operation or It is to install a lift, everyone must pay attention to safety.In addition, during installation, it is strictly forbidden to use hammers, etc. to prevent damage to bearings or gears due to excessive axial force or radial force. Be sure to tighten the mounting bolts before tightening the force bolts. Before installation, clean the anti-rust oil on the motor input shaft, the positioning boss and the connection parts of the elevator with gasoline or zinc and sodium water. Its purpose is to ensure the tightness of the connection and the flexibility of operation,Lv LiangElevating cargo elevator, and to prevent unnecessary wear and tear.Lv Liang,The motor winding is short-circuited. When a short-circuit fault occurs in the motor winding, the short-circuit current is much larger than the normal operating current, which increases the copper loss of the winding, causing the winding to overheat and even burn out.Walking: assisted self-propelled, two-wheel traction, self-driving, and car modified.Unscrew the screw on the dust-proof hole outside the flange of the elevator adjust the PCS system ring to align the side hole with the dust-proof hole, and tighten the inner hexagon. After that, remove the motor shaft key.


Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

If you think this entry needs to be improved, please edit

Previous ShangheblockFocus on industry    Next CalvinaSteel pipeImportance of customer maintenance for enterprises

Synonym

No synonyms