In the whole process of transmitting electromagnetic energy in the power supply system, it will inevitably cause the loss of voltage and output power. When transporting the same output power, the voltage loss is inversely proportional to the voltage, and the output power loss is inversely proportional to the square meter of voltage. The transformer is used to increase the voltage and reduce the closing damage.During no-load test run, the transformer shall be connected with the working voltage from the switching power supply side, and then make the working voltage impulse closing.East brova gurnica,In order to better avoid overvoltage damage, a group of overvoltage maintenance high-voltage Arresters (such as ycs active zinc oxide high-voltage arresters) shall be refitted at the working voltage bus duct side of dry-type transformer.When leaving the factory the production and processing are not smooth and the sealing is poor. The common fault of oil leakage will be caused after the oil transformer is sealed for a period of time.Guder,East brova gurnicaDry type transformer 1250kva,Before no-load impulse closing, the transformer shall be placed for h, and the rising seat and waterproof sleeve installed with vent plug shall be deflated on time.What is the wiring mode of dry-type transformer?The vibration reduction of the grounding device sheet solves the problem of modifying the fixed hard connection between the copper sheet of the grounding device and the dry-type transformer. The original oscillation of the dry-type transformer will be transmitted to the metal in the concrete by the baffle and cause low-frequency noise. Therefore, it must also be changed to produce flexible connection.


East brova gurnicaPower transformer 2Meticulous workmanship



From the appearance, the packaging types are different. The transformer core and electromagnetic coil can be seen immediately for dry-type transformer, and only the shell can be seen for oil immersed transformer;Accurately measure the resistance of each phase winding and carry out the measurement. If there is a great difference, and then accurately measure the inter chip insulation resistor by AC voltage and galvanometer method. If the damage is not large, paint the damaged part.The bearing capacity of each load is different. Generally, dry-type transformer should operate under rated capacity, while oil transformer has better load working capacity.Recommendation and consultation,East brova gurnicaDry type transformer production video,After no-load test run is normal for h, it can be transferred to on-load operation, and the load shall be gradually increased from %, % and % by grade.(IV) the transformer on the column shall be stable and firm and the waist rail shall be & phi; mm galvanized wire shall be wound over turns in an even number. The iron wire shall not have a connector and shall be tightened after winding. The distance between the waist rail and the energized part shall not be less than .m.Overload or short circuit occurs inside the power transformer. Flammable insulating raw materials are endangered by high temperature and electric isolation, which dissolve and ignite, resulting in a lot of steam bodies, greatly increasing the internal working pressure of the power transformer, causing the ignition of the casing, causing large-scale power failure, endangering all normal production,East brova gurnicaPicture of oil immersed transformer disassembly, manufacturing and activities. There are three reasons for fire accidents in the operation of power transformers.


East brova gurnicaPower transformer 2Meticulous workmanship



& ldquo; YN, D & rdquo;, in which indicates that when the working voltage phasor of the primary side line, as the minute hand, refers to the position at o'clock, the phase voltage phasor of the secondary side is at o'clock. That is, the phase voltage UAB of the secondary side lags degrees behind the working voltage uab of the primary side line (or degrees ahead).install,The whole process of hanging the core of dry-type transformer is more critical, and there are many situations that the hanging core of dry-type transformer must pay special attention to. Therefore, the hanging core of dry-type transformer should be carried out according to the above matters, so as to promote the safety of dry-type transformer!The secondary inductive equipment of the distribution station (such as transformer, voltage transformer, automobile relay, etc.) operates normally. According to the AC current, the winding transformer core will send out a symmetrical rhythm and a certain tone & ldquo; Buzz buzz & rdquo; Sound. The operation staff of the transformer manufacturer should understand and grasp the characteristics of the noise. When the equipment has common faults, there will be noise and even & ldquo; Crackle & rdquo; The charging and discharging sound can distinguish the generation and characteristics of common equipment faults according to the music law and sound transformation when everything is normal and abnormal.The switching power supply lacks one phase of power;East brova gurnica, it will inevitably cause the loss of voltage and output power. When transporting the same output power, the voltage loss is inversely proportional to the voltage, and the output power loss is inversely proportional to the square meter of voltage. The transformer is used to increase the voltage and reduce the closing damage.When the new oil filled by the power transformer and the oil sample that has just been considered are used, the oil sample can be used only after sufficient standing.After no-load test run is normal for h, it can be transferred to on-load operation, and the load shall be gradually increased from %, % and % by grade.