DaventelDry type transformer sizeHow to choose the equipment that suits you

release time: 2022-06-21 13:48:38

Daventel3000 oil immersed transformer,

The plastic shells of electrical products and office supplies are equipped with grounding wires. If the insulation layer is damaged and the shell is energized, the electric flow will leak into the earth along the installed grounding wires,DaventelModel and parameters of power transformer, so as to achieve the purpose of safety, otherwise it will have an adverse impact on life safety.Before and after sampling, clean the periphery of the sampling port with clean or hairless linen.Daventel,How is the quality level of dry-type transformer compared with foreign countries?It will also produce many faults, effectively deal with various faults of oil immersed transformer, make full use of the performance indicators and advantages of oil immersed transformer and continuously improve the safety factor of oil immersed transformer. Ignition is a common fault of oil immersed transformer. The key fault of oil immersed transformer is short-circuit fault, and short-circuit fault is more general.Guaimaca,The flange surface is uneven, the tightening bolts are loose, and the installation and processing process is wrong, so that the bolts are not tightened well, resulting in oil leakage.Oil immersed transformerIn order to better reduce the probability of short-circuit fault of relay protection dry-type transformer, prevention and key are & ldquo; Prevention and Manipulation & rdquo; Is dominant.


DaventelDry type transformer sizeHow to choose the equipment that suits you



Wiring mode of dry-type transformer:Several detection methods for installing transformerNote: in the whole process of safety patrol inspection, the on-site operation and maintenance management staff must use temperature tester or thermal imager to carry out purposeful inspection on the transformer itself,DaventelOil immersed transformer installation procedure, terminal block and other accessories; The sound during the operation of the transformer is a symmetrical current sound. If the sound is found to be abnormal, or there is local sound, the cause shall be found immediately and certain effective measures shall be taken. If necessary, the load can be reduced or the operation of the transformer can be stopped.Inspection basis,The power transformer is designed according to the temperature protection scheme. The embedded parts in the material layer of high (low) pressure electromagnetic coil poured with integral concrete are provided with longitudinal ventilation duct, which can be equipped with air-cooled machinery and equipment (cooling centrifugal fan). After selecting air-cooled machinery and equipment, the output capacity can be increased by %.The capacity and working voltage are different. The dry-type transformer is generally suitable for distribution equipment. The capacity is generally below kVA and the working voltage is below KV, which also ensures the rated voltage of kV; Oil immersed transformers are generally suitable for distribution equipment.It includes the performance and main uses of insulating layer materials, various insulating layer parts, component manufacturing processes and quality standards; Performance and main uses of various wires, solution process and quality standard, overall suit process and quality standard of electromagnetic coil; Main performance parameters of ferrite core, core stacking process and quality standard, production process and quality standard of electromagnetic shielding.


DaventelDry type transformer sizeHow to choose the equipment that suits you



Fault judgment of power transformerHighly recommendedIf you want to check the activated carbon fiber for the hanging cover, first take out the low-voltage waterproof sleeve and the on load transformer power switch, then lower the bell cover anchor bolt of the large cover, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, wear round steel from top to bottom in the surrounding screw holes, and count the spacing and specifications for easy reinstallation. At the same time, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for mm, stop the lifting stabilize the bell cover, and check the bearing capacity of the lifting core, center of gravity and Jack. After everything is normal, lift it again until the bell cover exceeds the relative height of the body, and rotate the crane to place the bell cover on the clean skid.Precautions for trial operation of power transformer manufacturersIf the power transformer stops running for more than h (if the allowable time should be reduced when the ambient humidity is & amp; gt; %), it should be insulated before putting into use, and accurately measured with a V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ mfl, the insulation resistance from the secondary side to the ground should be ^ mh, and the insulation resistance from the iron core to the ground should be & amp; gt; mfl (note that the grounding device piece should be removed).Daventel,When the new oil filled by the power transformer and the oil sample that has just been considered are used, the oil sample can be used only after sufficient standing.Power transformer plantThe method and whole process of taking oil sample of power transformer are as follows: