Create entry
World Encyclopedia  > category  >  Building Materials Encyclopedia   

Bologne CountyConstruction site lifting cargo elevatorThe improvement effect of the pattern

release time: 2024-04-19 21:35:51

Ensure good power supply at the installation site, install a separate distribution box, and the leakage switch must meet the requirements for construction elevators when used in the distribution box. If the construction elevator installed is frequency conversion, the leakage switch should be adapted to the frequency converter when selecting the leakage switch .Precautions for elevator installation Keep the access road of the external construction elevator smooth and have enough parking space for equipment. When it is necessary to use a steam crane for auxiliary installation, it should be fully considered whether the site environment meets the operating conditions of the steam crane.Bologne County, strong stability, low maintenance cost. It is suitable for various vehicles on the loading and unloading yard and places with relatively heavy traffic. Loading and unloading platform, lifting platform, unloading platform: Anti-slip device: This device is welded by steel plates, which can realize the anti-slip function efficiently and is reliable.The daily maintenance of the hydraulic lifting platform in normal use is essential, but even if there is normal maintenance on the equipment, any possible problem cannot be ignored, so in order to ensure that the process of using the hydraulic lifting platform for each operation What aspects do we need to check before operation? Today, the editor will give you a popular science.Suri, wire ropes, chains, and pulleys are made of solid materials to ensure safety.The safety device of the guide rail hydraulic lifting platform The mechanical part of the guide rail hydraulic lifting platform mainly includes the hydraulic system and the mechanical device.What kind of function can be achieved by installing the elevator? Before installation, confirm whether the motor and the elevator are intact, and strictly check whether the dimensions of the parts connected to the motor and the elevator match. Here are the dimensions of the positioning boss of the motor, the input shaft and the groove of the elevator. Fitting tolerances.


Bologne CountyConstruction site lifting cargo elevatorThe improvement effect of the pattern



Secondly, there must be no dirt on the friction surface. If there is dirt, it needs to be washed off with gasoline or thinner; the gear box, gearbox, external gear and other parts of the equipment and the hydraulic oil must be in accordance with the requirements in the table; Correctly maintain the hydraulic guide rail lift. Regularly check whether the wire ropes in each part are broken or loose. If this phenomenon is found, replace them in time. If there is any looseness, it should be tightened in time. The connecting bolts of the equipment should be checked for tightness when the body is under pressure. All connecting shafts should be equipped with cotter pins; check whether each mechanism is operating normally, whether there is noise or failure to eliminate all faults in a timely manner; when installing, dismantling and adjusting the slewing mechanism of the equipment, it is necessary to pay attention to the parallelism between the reducer and the center line of the gear, and the appropriate meshing gap; conduct a comprehensive inspection of the equipment regularly, whether the wires and cables are If there is damage, whether the motor is overheated, replace it in time and continue to run after troubleshooting; ensure that the bearings of the motor, each box, distribution box and brushes must be kept clean, and the travel switch points of each safety device must be safe and reliable.The operating rod is heavy. The operating rod mechanism is faulty. Check, adjust, and replace unqualified parts; clean the valve parts; check the hydraulic oil cleanliness and the valve core is stuck (manufacturing, installation problems,Bologne CountyElectric cargo elevator, dirt problems)Are the water cooling and air cooling of the hydraulic station the same?superior quality,Anti-corrosion measures for the body of aerial work vehicles Pay attention to small scratches. The paint surface of aerial work vehicles is often corroded. In addition to common collisions, scratches, small rocks on the driving tires, and a small rust will appear after a long time. Because most of these scars are small, they are easy to ignore. Therefore, the engine compartment cover and its surroundings, and once found, go to a professional beauty shop for processing.The safety device and application of the guide rail hydraulic lifting platform The use of the guide rail hydraulic lifting platform The guide rail hydraulic lifting platform is a non-scissor hydraulic lifting freight elevator. It is used for goods between different floors of industrial plants, restaurants, restaurants, etc. The low height can be made to -mm. The advantage is that it can be placed directly on the ground without digging pits, reducing engineering construction costs, and there is no need to set up hanging points on the top, which is safe. Reliable; the hydraulic lifting platform adopts hydraulic transmission mode, and can be non-calibrated according to customer needsSeveral types: Motor winding open circuit. When one of the motor windings is disconnected, or one of the parallel branches is disconnected, the three-phase current will be unbalanced and the motor will overheat.It is best not to cover the aerial work vehicle and park the vehicle outside. If it is windy and rainy, the clothing will repeatedly slap the car paint, especially if the car blows sand on the clothes, it will draw many fine scratches on it. Because it will turn black over time. In addition,Bologne CountyFive ton cargo elevator, when the wind does not directly spray powder or clean the sand on the mechanism, but it should be washed with water, and prevent the sand particles on the paint surface from being scratched by the vacuum cleaner.


Bologne CountyConstruction site lifting cargo elevatorThe improvement effect of the pattern



Check the front page of the oil pipe to check whether the skin of the oil pipe of the hydraulic lifting platform is damaged or cracked, and if so, replace it immediately; secondly, check whether there is any sign of looseness at the connection between the oil pipe and the oil pipe, and if so, tighten it immediately to avoid lifting on the hydraulic lifting platform There is an oil spill in the process, which leads to accidents; what items need to be checked before using the hydraulic lifting platform? Cut off the power first to avoid tragedies such as electric leakage and electric shock)Honesty and mutual benefit,Fixed lift is a kind of transportation equipment that directly lifts and unloads goods from the ground. It is mostly used in places such as goods transportation between height differences in production lines, materials on and off the assembly line, parts lifting during large-scale equipment assembly, and fixed three-dimensional parking. So what is the new price of the fixed lift?Introduction to fixed boarding bridge Loading and unloading mobile boarding bridge is a very easy-to-see structure in the modern logistics scene. It is the point and end point of the enterprise's logistics chain, and a loading and unloading operation platform for the enterprise's fast and turnover products and goods. The height of the loading and unloading operation platform is fixed, but there is always a certain height drop or gap between the height of the transport vehicles and the loading and unloading platform. As a result the handling forklift cannot directly load and unload goods in and out of the transport vehicle. Utilize a boarding bridge to provide a reliable connection. It enables the forklift to move in and out of the transport vehicle efficiently and quickly for loading and unloading operations.Mechanisms: Mechanisms such as tabletops, track grooves, wire ropes chains,Bologne County1 ton lifting cargo elevator, and pulleys are made of solid materials to ensure safety.Bologne County, the loading and unloading of materials, the adjustment of the working height during the assembly of the workpiece, the feeding of the installed machine at a high place, the lifting of parts during the assembly of large equipment, and the storage and unloading place and Forklifts and other handling vehicles are used for fast loading and unloading of goods, car lifting, fixed three-dimensional parking and other places.Check the limit switch to see if all the limit switches are loose. If so, please tighten them. Pay special attention to the ultra-high protection stroke of the hydraulic lifting platform to avoid accidents caused by the equipment exceeding the high safety height; check the pins (ear pins and center pins) Check whether the nuts, nuts, screws, etc. are loose, if any should be reinforced immediately; ensure that the hydraulic lifting platform rises and falls smoothly; outriggers (for high-altitude operating platform)The cleanliness of the hydraulic station is an important aspect of the elevator hydraulic station, so it should not be careless. Moreover, from a professional point of view, there are relevant rules and requirements and you should refer to the specification manual, so that you can have a correct understanding and know how to achieve better cleanliness.


Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms