Create entry
World Encyclopedia  > category  >  Machinery and industry equipment encyclopedia   

AneznoTheater stage lifting platformReasons for the increase in production

release time: 2024-04-22 03:57:13

If the elevator is in a downward direction, immediately close the door and return to the first floor station, and automatically open the elevator door.Machine room power supply: The power supply should be three-phase V,AneznoSelf propelled aluminum alloy elevator, HZ, and the lighting power supply should be single-phase V, HZ. The incoming line should be connected to the vicinity of the machine room entrance and equipped with an incoming socket. Specializing in product and renewable resource business, including: home elevator manufacturersAnezno,When encountering abnormal elevator operation, you can call the repair hotline to consult with the maintenance personnel or inform the service center to handle it. Do not take unauthorized measures to avoid causing greater harm to the elevator or even causing casualties.In the event of a fire, when instructed by the fire center or the dedicated operation button of the first floor firefighter to enter the firefighting state, the elevator should immediately stop on the floor without opening the door, return to the first floor station, and automatically open the elevator door if it is in the upward direction.Upington,For escalators that require intermediate support, it is necessary to determine whether the site has the conditions for adding support, as well as the range of support that can be added the height and load size of the equipment and support platform, and other parameters.b. When the old elevator cannot start: due to the inability to enter the shaft, limited data can only be obtained from outside the shaft to determine whether it is non-standard (if there is a high platform in the machine room, the plane size of the shaft can be measured in the machine room, but it is not accurate enough) for elevator quotation negotiation reference. In this case, the signing of the contract should state that the shaft rectification and costs are the responsibility of the user. For uncertain shaft structures and dimensions, users should be reminded to provide them to the elevator after the old elevator or notify the elevator to take measurements before the new elevator is put into operation.The compensation chain and rope shall not collide with the shaft or other components during the operation of the elevator.


AneznoTheater stage lifting platformReasons for the increase in production



To implement the arrangement of escalators and provide feedback in order to determine the configuration of certain shared devices, the order of shipment, and the alignment of handrail turns during continuous arrangement.Household elevators must be regularly maintained to confirm their safety and whether they can continue to operate, while also repairing any faults and hidden dangers found.The household must make two steel splints above the entrance. The position and size of the clamp plate are determined based on the selected door machine model.Promotion,Cleaning and cleaning of elevator car guide shoes. As is well known, and there is an oil cup on the guide shoe. To ensure that the elevator does not make any noise during operation, it is necessary to regularly refuel the oil cup and clean the guide shoe and the cabin should be cleaned thoroughly.The call button on each floor is no longer working, and the call is cut off.The requirement for the shaft is that it should not be plastered, but there should be no protruding foreign objects.


AneznoTheater stage lifting platformReasons for the increase in production



The speed limiter tensioning device and the steel belt tensioning device should be equipped with a safety switch.Inspection requirements,Multiple elevator shafts can be connected and an - # I-beam can be fixed at a certain height between each adjacent elevator shaft,AneznoHousehold outdoor elevator on the third floor, the elevator does not stop: to avoid overloading, the elevator car no longer responds to the next station's outbound call.Measure the beam edge distance between the upper and lower support beams. The measurement is to suspend the line from the upper support point to the ground for positioning, and then measure the horizontal distance from the positioning point to the edge of the lower support beam.Anezno,There are dedicated operation buttons for firefighters at appropriate positions at the entrance of the first floor elevator. The operation buttons are generally protected by glass sheets and have a red&# quo; mark in place; Dedicated to fire protection; Words such as.The speed limiter tensioning device and the steel belt tensioning device should be equipped with a safety switch.Measurement of elevator shafts in new construction projects under different on-site conditions: When the building design is not yet completed, the operator only needs to provide the user with the standard elevator layout of the required elevator specifications, and the user entrusts the design department to design the elevator shaft. When the architectural design has been completed, and the site has not yet been constructed, is under construction, or has been completed, it must be determined based on the current construction or measured dimensions. If the original civil design of the shaft needs to be modified, the user should entrust the architectural design department to make the shaft design modification based on the layout provided by the elevator.


Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms