KarigalinCatherine Hardwicke Steps of protective construction
release time: 2024-05-06 09:09:03
When a rigid mm square or circular flat surface is applied with a normal force of N to either side of the door, the door may not meet the above requirements, but safety should be maintained.Limit switches should be triggered directly by the movement of the suspension cage or its related components.Model Example: Hanging Cage Specification: LABSC/TDx Type I: ~ Type II: ~ Type V: ~ Technical Requirements: The load-bearing capacity of the foundation should be greater than P: P=(hanging cage weight+outer cage weight+total weight of guide rail frame+counterweight+load) x. (kN).Quality risk,Setting requirements: When the distance between the outer edge of the construction electric elevator and the external overhead power line cannot meet the requirements of a small safety distance, the protective measures taken should comply with the specification requirements.Stage equipment safety door. To prevent personnel from extending their heads hands, and feet out of the shaft and objects from falling into the vertical shaft. Its vertical position should be closed its cabin should be full of doors, and the height of the hoistway (hall door) should not be less than meters; The electric door opening and closing switches should be removed from the vertical and passenger compartment doors. In order to prevent accidents caused by vertical, passenger car doors, and car roof doors not being closed.; Door interlocks should be installed on both the vertical and passenger compartment doors.The bearing capacity of the ground under the concrete foundation plate should be greater than .Mpa.
Horizontal lead screw mechanical electricitydiscount, the products of electric lifting platform vehicles have been continuously improved, and various new technologies and materials have emerged, making the further development of lifting platform vehicles possible.Construction electric elevators should be equipped with upper limit switches that are sensitive and reliable.Horizontal lead screw mechanical electricityKarigalin,Setting requirements: Drainage measures should be set up for the foundation of construction electric elevators to ensure smooth drainage.Human improper operation is the main factor causing malfunctions in scissor type electric elevators. When stacking goods, electric elevators should stack the goods neatly, which is better than stacking them in the center of the cargo stacking area of the cargo elevator to avoid imbalance between the two ends of the stacking area. Eventually, during the operation of the electric elevator, it may cause the electric elevator to lose balance. After the goods are stacked completely, ropes should be used to lock the goods, so that they are not afraid of the goods during the lifting process; Careless; Scattered downThe bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.
Attachment list
The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.
If you think this entry needs to be improved, please edit
Previous ArgentinaThe wooden floor is goodReversal of supply-demand relationship Next CharlotteIndustrial hydraulic lifting platformNeed to adjust the industry structure