EnsadSightseeing elevator household useWhat are the basic knowledge of

release time: 2024-05-08 23:18:09

The speed limiter tensioning device and the steel belt tensioning device should be equipped with a safety switch.For escalators that require intermediate support, it is necessary to determine whether the site has the conditions for adding support,EnsadAluminum alloy movable lifting platform, as well as the range of support that can be added, the height and load size of the equipment and support platform, and other parameters.Ensad,Slide elevators are installed inside buildings and are often used parallel to buildings and sidewalksMultiple elevator shafts can be connected and an - # I-beam can be fixed at a certain height between each adjacent elevator shaft,The front room of the fire elevator is equipped with indoor fire hydrants.The safety monitoring machine room environment screen cabinet main power switch traction wheel speed limiter shaft and pit guide rail layer door and car counterweight should be reliably fixed with pressure plates to prevent loosening.Tower style residential buildings above; Residential units and corridors with twelve or more floors; Other Class II public buildings with a building height exceeding meters; High rise buildings with elevators exceeding meters in height; The functional fire elevator has a front room. The area of the independent fire elevator front room is: the front room area of the residential building is greater than square meters; The front room area of public buildings and high-rise factory (warehouse) buildings is greater than square meters. When the front room of the fire elevator is shared with the smoke proof staircase, its area is: the area of the shared front room in residential buildings is greater than square meters, and the area of the shared front room in public buildings and high-rise factory (warehouse) buildings is greater than square meters.


EnsadSightseeing elevator household useWhat are the basic knowledge of



The treatment of general civil engineering problems on escalator sites: the beam edge distance is too large: in this case, the length of the upper and lower platforms of the escalator can be increased to meet the actual dimensions of civil engineering. One platform can be extended on one side, attention should be paid to the length of the pit or the opening of the floor slab, which should also be lengthened at the same time. After the escalator is extended, the force on the upper and lower support points will also increase. If the edge distance of the beam increases too long, support needs to be added in the middle of the escalator truss. In addition, changing the angle of the escalator from degrees to degrees can also make the beam edge distance longer.Elevator Tip : Why elevators can trap people? Every elevator door on each floor has a safety switch, which can trigger the elevator to shut down in case of any abnormality. The elevator getting stuck is actually when the system detects an abnormal signal and triggers a protective device, like braking to stop.For escalators that require intermediate support, it is necessary to determine whether the site has the conditions for adding support, as well as the range of support that can be added, the height and load size of the equipment and support platform, and other parameters.Analysis project,The mechanical components of the elevator's traction machine require oil. There are two scales on the outer cover of the traction machine. Open the oil nozzle to check that the oil should be in the middle of the two scales. If the oil is lower than the lower scale, the elevator will not operate well for a long time, leading to the burning of the elevator traction machine and motor. After the elevator has been running for a long time, the oil should be replaced in a timely manner to keep the traction machine clean and in good condition.For escalators that require intermediate support, it is necessary to determine whether the site has the conditions for adding support as well as the range of support that can be added, the height and load size of the equipment and support platform, and other parameters.There are dedicated operation buttons for firefighters at appropriate positions at the entrance of the first floor elevator. The operation buttons are generally protected by glass sheets and have a red&# quo; mark in place; Dedicated to fire protection; Words such as.


EnsadSightseeing elevator household useWhat are the basic knowledge of



Machine room power supply: The power supply should be three-phase V, HZ, and the lighting power supply should be single-phase V, HZ. The incoming line should be connected to the vicinity of the machine room entrance and equipped with an incoming socket. Specializing in product and renewable resource business, including: home elevator manufacturersDesign brand,Measurement of elevator shafts in new construction projects under different on-site conditions: When the building design is not yet completed, the operator only needs to provide the user with the standard elevator layout of the required elevator specifications, and the user entrusts the design department to design the elevator shaft. When the architectural design has been completed,EnsadFlip plate hydraulic roadblock machine, and the site has not yet been constructed, is under construction, or has been completed it must be determined based on the current construction or measured dimensions. If the original civil design of the shaft needs to be modified, and if they are overweight the user should entrust the architectural design department to make the shaft design modification based on the layout provided by the elevator.Overloaded elevators do not operate: The load of elevators is limited, they will alarm and generally cannot be started. Most passengers can also voluntarily exit.Tower style residential buildings above; Residential units and corridors with twelve or more floors; Other Class II public buildings with a building height exceeding meters; High rise buildings with elevators exceeding meters in height; The functional fire elevator has a front room. The area of the independent fire elevator front room is: the front room area of the residential building is greater than square meters; The front room area of public buildings and high-rise factory (warehouse) buildings is greater than square meters. When the front room of the fire elevator is shared with the smoke proof staircase, its area is: the area of the shared front room in residential buildings is greater than square meters, and the area of the shared front room in public buildings and high-rise factory (warehouse) buildings is greater than square meters.Ensad,The door closing button has no self maintenance function. During the designated maintenance period, the elevator components in operation are inspected,EnsadHousehold traction small elevator, refueled, dust is removed, and safety devices are debugged. Including non-destructive testing and maintenance of elevator traction steel wire ropes.Attention: The elevator consists of two main parts: mechanical and electrical. If the elevator is not maintained on a daily basis, its safety cannot be guaranteed. If the elevator needs to be refueled without refueling, it will cause wear and tear on the mechanical components of the elevator, greatly shortening its service life and preventing normal use of the elevator.Please note that there should be a space of over mm left on both sides of the escalator, and when arranged in parallel, there is no restriction between the two escalators.