Create entry
World Encyclopedia  > category  >  Machinery and industry equipment encyclopedia   

Cohen Roden kirchenMobile boarding bridgeProblems in the work and improvement measures

release time: 2024-03-26 22:59:21

The frequency conversion system circuit of the construction elevator is mainly composed of two parts: the main circuit and the circuit. The main circuit is mainly composed of a construction lifting cargo elevator (hereinafter referred to as the lifting cargo elevator) driven by a more complex rectifier. Before installation, all the eccentric roller shafts of the lifting cage and driving mechanism are loosened or adjusted to a large eccentricity. The lifting cage and driving mechanism are installed in the guide rail frame respectively, power on the suspension cage to lift it m above the ground or detach it from the ground buffer spring (or support). The adjustment and sequence are as follows: . Use a special wrench to rotate the lower double (single) pendulum eccentric shaft to adjust the eccentricity to ensure that the installation plate surface of the driving mechanism is perpendicular to the horizontal plane, and ensure that the upper and lower pendulum wheels evenly guide the rails at the same time. Use your hand to move each wheel body and check if it evenly presses the rails; . Use a special wrench to rotate the eccentric shaft of the gear rack back pressure wheel to adjust the side clearance during gear rack meshing. When adjusting, use a feeler gauge to measure the side clearance to .; Between .mm, each pressing wheel should evenly press on the back of the rack. Move each wheel body by hand to check if it evenly presses against the tooth back. Similarly, adjust the guide rollers on both sides of the guide rail. The adjustment key is to adjust the guide wheel on one side of the guide rail to lightly press it onto the guide rail. When moving the wheel body by hand, it should be possible to rotate but there should be obvious obstruction; The roller on the other side should maintain a clearance of .-. ram with the guide rail; . Adjust the lifting cage according to the above and sequence. If the driving mechanism and the lifting cage are integrated into the lifting cargo elevator, the lifting cage should be adjusted according to the and sequence of adjusting the driving mechanism. Conduct a visual inspection of the operation of each roller, and use the lead pressing method and coloring method to check the meshing of the gear pair; Fine tune pairs of unsatisfactory parts. The key point is to carefully adjust the meshing status of the gear pair: when the spots shown in appear on the surface of the gear rack, it indicates that the driving mechanism is tilted towards the side of the guide rail. At this time, the lower swing wheel (single or double wheel) should be adjusted to move the lower part of the driving mechanism towards the direction of the guide rail until the area of the spots reaches more than % of the surface of the gear rack. The smaller the area, the easier it is to damage the gears and racks.When loosening occurs, due to alternating loads such as impact and vibration,Cohen Roden kirchenPrice of 10 ton mobile boarding bridge, as well as factors such as heat and deformation,Emergency descent: Handle operation or use of manual pressure relief and activation of emergency battery system to implement emergency descent function safety net.All connecting shafts must have split pins and be sufficient.Nav,Check the smooth steel wire rope and various fasteners, if there is excessive wear, it is necessary to replace themCheck and repair the electrical circuit and control panel switch components. If there is aging in the circuit replace itQuarterly maintenance: Check the items checked each month


Cohen Roden kirchenMobile boarding bridgeProblems in the work and improvement measures



Regarding the construction elevator with counterweight, check the adjustment and fixation status of the counterweight guide wheel. Check the balancing equipment of the steel wire rope, the crown wheel, and the counterweight steel wire rope bracketDuring aging treatment, the equipment prints the vibration aging curve online. According to the curve, the front end of the a-t curve shows an upward trend indicating that the damping inside the component decreases after vibration treatment, so the amplitude gradually increases; Since then, the amplitude change has been basically stable, indicating that the structure of molecules inside the component tends to be stable, which conforms to the judgment standard of curve observation strip, thus it can be determined that the workpiece has reached the effect. The precautions for using an electric lifting platform are as follows: the user unit should arrange a dedicated person to operate the lifting platform and develop details and safety precautions for the use of the lifting platform based on their own unit's situation, and hang it in a prominent position. When working on an electric lifting platform, professional drivers and operators must be equipped, and they must undergo specialized training and be qualified. They must hold relevant certificates and take on corresponding responsibilities according to the actual situation of the work. After the construction is completed, the lifting platform needs to be moved on the site and should be operated by a professional driver. Before daily work, zy drivers must carefully check the electrical, hydraulic, and mechanical systems of the platform, check the working range of the lifting platform truck, and remove obstacles that hinder the rotation and walking of the lifting platform truck. And empty the platform up and down several times to check for any faults or abnormal phenomena. It is also necessary to pay attention to the accuracy of the platform platform landing station for any obvious abnormal differences. Professional improvement of quality assurance for aircraft manufacturers. The promotional activity is ongoing, and new and old customers are welcome to come for consultationLifting and loweringQuotation sheet,  ?? When the construction supervisory department fulfills its safety supervision and inspection responsibilities, it shall order the immediate elimination of potential safety hazards in the production of construction elevators and cargo elevators discovered during the inspection. If safety cannot be guaranteed before or during the elimination of major production safety hazards, it shall be ordered to evacuate workers from the hazardous area or temporarily stop construction. In the work of hazard investigation and control, the investigation shall be serious, the rectification shall be resolute, and the results shall be consolidated.On the contrary, it should be adjusted in the opposite direction; When the meshing backlash of the gear pair is greater than .mm, loosen the connecting nut of the eccentric shaft of the guide roller and the tooth back pressure wheel as shown in , adjust the tooth back pressure wheel to press towards the back plane of the gear rack until the backlash reaches a reasonable range. Otherwise, it should be adjusted in the opposite direction. At this point, the guide roller should be loosened for o and then adjusted according to the adjustment of the guide roller.Ensure that the small gear and pressure wheel are securely fastened on the drive base plate, and check the fixing condition of the drive base plate bolts


Cohen Roden kirchenMobile boarding bridgeProblems in the work and improvement measures



Check the relative orientation between the cable support wall and the cable guide framesuperior quality,Many times, after installing hydraulic cargo elevators in factories, floors, docks, and other places, there may be some adverse reactions and problems in the early stage. Below Yakali's editor summarizes some common problems with hydraulic cargo elevators and provides some statements on how to solve and prevent these problems.The lifting foundation of the platform is a large structural component made of alloy steel plates with different thicknesses that are welded together. The welding amount is large, the structural shape is complex, and residual stress is inevitably generated during the manufacturing process. In order to prevent deformation of the components due to changes in residual stress during use,Cohen Roden kirchenGuide rail vertical lifting platform, it is necessary to perform stress relief treatment on the completed components.  ?? Hidden danger investigation relies on joint efforts from all aspects:?? Construction enterprises are the main responsibility for identifying hidden dangers in construction elevators. They should strengthen daily inspections and regular inspections, and carefully inspect the steel structure safety protection devices, and transmission devices of construction elevatorsCohen Roden kirchen electrical devices,  ?? Hidden danger investigation relies on joint efforts from all aspects:?? Construction enterprises are the main responsibility for identifying hidden dangers in construction elevators. They should strengthen daily inspections and regular inspections, and carefully inspect the steel structure, safety protection devices, electrical devices, and transmission devices of construction elevatorsWhat are the functions of anti rust primer for warehouse cargo elevators?Leakage occurs due to looseness, vibration, and the influence of heat on the sealing surface and pipe joints of the machine; Some casting, processing and other defects are difficult to detect during assembly and debugging, but due to vibration and impact during the operation process,Cohen Roden kirchenCylinder mounted hydraulic lifting platform, these defects are exposed, leakage is prone to occur during the running-in period. Poor, due to the small fit clearance of newly assembled components and the difficulty in ensuring the uniformity of fit clearance due to assembly and other reasons, oil (grease) is not easy to form a uniform oil film on the friction surface to prevent wear. This reduces efficiency and causes early abnormal wear of the components. In severe cases, it can cause scratches or bite on the friction surface of precision fitting, leading to the occurrence of faults.


Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms