RavikDry type power transformer 1250kvaRecommended purchase criteria

release time: 2022-05-29 07:08:36

(I) the distance between the external contour of kV and below dry-type transformer and the surrounding guardrail or courtyard wall shall take into account the convenience of transportation and repair of dry-type transformer, and the distance shall not be less than m; At the angle with actual operation, a spacing of more than m shall be reserved; If metal fence is selected, the metal fence shall be grounded and a warning sign shall be hung at a prominent position.When using the oil sample of the power transformer in operation, it is necessary to add some oil from the oil gate valve at the lower part of the oil tank or the sampling gate valve to release about kg of waste liquid stored at the bottom to clean the oil inlet, and then take the oil sample.Ravik,After the power transformer has been used for a long time, common faults of iron core will occur. Don't worry. Contact the transformer manufacturer, and the manufacturer will assign professional technicians for inspection. The main reasons are as follows:Wiring mode of dry-type transformer:Qarazhal,When the transformer is out of phase, if the second phase is blocked, there is still no sound when the second phase is sent, and there is sound when the third phase is sent; If the third phase is blocked, the sound will not change, as in the case of the second phase. There are three reasons for phase deficiency:& ldquo; YN, D & rdquo;, in which indicates that when the working voltage phasor of the primary side line, as the minute hand, refers to the position at o'clock the phase voltage phasor of the secondary side is at o'clock. That is, the phase voltage UAB of the secondary side lags degrees behind the working voltage uab of the primary side line (or degrees ahead).Power transformer manufacturer


RavikDry type power transformer 1250kvaRecommended purchase criteria



Dry type transformer manufacturerVisual inspection method for transformer inspectionThe main reason is that the welding quality of electric welding is poor,RavikRequirements for oil immersed transformer room, open welding, needle holes, sand holes and other shortcomings in welding. The oil transformer is easy to be covered with welding powder and paint when leaving the factory, and the potential safety hazards are exposed after operation. In addition, the electromagnetic induction vibration will crack the electric welding and lead to leakage.index,Due to careless transportation of the transformer and the thin high-voltage conductor, the transformer was disconnected by vibration (but there was no grounding device).Gradually, high-frequency vibration damping mechanical equipment, such as low-frequency vibration damping platform,RavikPower transformer picture, is installed at the bottom of the dry-type transformer, which can reduce the downward dispersion of the vibration of the dry-type transformer. Then replace the connection between the dry-type transformer and the surrounding engineering buildings, roads, etc. with flexible connection, or use elastic yellow shock absorption mechanical equipment to prevent the vibration from spreading according to the rigid connection. If possible, the dry-type transformer room can also be soundproofed and decorated, and sound-absorbing plates and silencing shutters can be used to improve the soundproofing capacity of the dry-type transformer room.When the power transformer operates at full load, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large, it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time,RavikPrice of 200 KVA transformer, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.


RavikDry type power transformer 1250kvaRecommended purchase criteria



The insulation distance between the winding and the iron yoke of power transformer is much larger than that between the windings, because the electric field between the winding and the iron yoke is far away and not as symmetrical as that between the windings. In the electric field in the middle of the winding, most of the cables are in phase with the insulating cylinder (plate) in the middle of the winding, that is, the disconnection component of the electric field is small.Which one is better,After the oil is drained, all anchor bolts of the automobile oil tank at the upper end of the detachable oil cover shall be tied with the lifting jack, and the lifting point shall be on the common earrings or bolts. If necessary, the human resources traction belt shall be used as a guide.Step up process of dry-type transformer?With the rapid development of society and the continuous development trend of computers, the calculation of data in the whole process of oil immersed transformer wave has long had results. Only effective selection of calculation entity models and methods is needed, the accuracy of calculation conclusions can meet the needs of architectural design, and scientific and reasonable data method is selected, but also the winding and other structures of the oil immersed transformer can be effectively arranged and distributed in a certain scope, which greatly facilitates the design scheme of the oil immersed transformer and ensures the stability of operation.Ravik,If the volume of power transformer is too small, the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore, the rated capacity of the transformer should be selected according to the power consumption which is not suitable for too large or too small.& ldquo; YN, D & rdquo;, in which indicates that when the working voltage phasor of the primary side line, as the minute hand, refers to the position at o'clock the phase voltage phasor of the secondary side is at o'clock. That is, samples shall be taken according to % of the total number of barrels (bottles).

but not less than barrels. When sampling in batches of small and medium-sized pails or bottles