Create entry
World Encyclopedia  > category  >  Building Materials Encyclopedia   

Zhang BoliAdvance small conduit in tunnel constructionIt is suggested that you should start from the source to reduce mechanical accidents

release time: 2024-04-16 01:08:47

The stability of the grouting pipe is one of the important factors to control the stability of the whole foundation pit. Its erection must be accurate and in place, and prestress must be applied in strict accordance with the design requirements. In particular, attention should be paid to the stability of the diagonal bracing. During the diagonal bracing operation, every link of the installation must be carefully operated. At the same time, the steel purlin must also ensure its stability strength and deformation requirements during the production and installation process. In addition, During the whole construction process from foundation pit grouting pipe erection to removal, the grouting pipe must be strictly monitored to ensure its stability. How to improve the bearing capacity of piles with grouting pipes in bored piles, during the drilling process of large-diameter cast-in-place piles, the soil layer around the piles will become loose due to the agitation of the turning heads. In addition, the water immersion makes the soil layer that has started to loosen more loose. This problem can be effectively solved by grouting with grouting pipes. How to improve the bearing capacity of piles when grouting with grouting pipes? performance of grouting pipe the grouting pipe is light in weight, has strong bite force with soil or gravel, is acid-base resistant, corrosion-resistant, aging resistant and easy to construct. It has high tensile strength (- times higher than that before stretching) and low elongation (only % - % of that before stretching). It is easy to cut and connect on site (polyethylene rope or connecting rod can be used for connection), and it can also be overlapped (the grouting pipe with overlapping buckle has been developed and can be connected without other materials), and the bending effect during construction is small. However, the grouting pipe has low hardness, poor mechanical damage resistance, and mechanical scars such as scratches and crushed stones will produce stress concentration, which will reduce the overall mechanical properties of the grouting pipe and the grouting pipe.Zhang Boli,Zhang BoliSupport small conduit,Inner diameter of repetitive grouting pipe: mm; Outer diameter: mm Inner diameter tolerance: ± .mm; Length of each roll: m.It is necessary to comprehensively consider the selection and configuration of grouting pipes, because there are many types of expansion joints, and correct selection is very important. Only in this way can the design of the piping system be safe, reasonable, reliable and economical.?Tezinets,The Xiaobian of prestressed machines and tools reminds us that there are many forms of grouting pipes, which can be distinguished from different angles, including the following. According to the type of reinforcement of the grouting pipe, it can be divided into the grouting pipe of thick reinforcement of the grouting pipe, the grouting pipe of parallel reinforcement (wire) bundle of the grouting pipe, and the grouting pipe of steel strand bundle of the grouting pipe. For thick reinforcement, one grouting pipe is generally used to anchor one reinforcement. For tendons and steel strands, a grouting pipe must anchor several steel bars or steel strands at the same time, which are often arranged in a ring or circle, or in a rectangle. Obviously, due to the different number and arrangement of prestressed reinforcement, the form and structure of grouting pipe will also be different. According to the principle of grouting pipe and transmitting pretension, it can be divided into grouting pipe relying on bearing pressure, grouting pipe relying on friction and grouting pipe relying on adhesion.In the construction of some grouting pipes, after the completion of the construction of the project, the project was damaged due to some external factors. In order to help users effectively improve the construction quality of the grouting pipes, the following article introduces the protective measures that should be taken after the completion of the construction of the waterproof layer of the grouting pipes. For various engineering designs, waterproof and water stop shall be carried out throughout the whole process of grouting pipe until the backfilling soil is completed.In the engineering practice, some construction units directly pave the glass fiber grouting pipe after spraying the sticky layer oil, and the roller rolls after it. The effect is good, and the glass fiber grouting pipe is not easy to wave. Strictly control the entry and exit of vehicles transporting the mixture, and forbid vehicles to swerve, brake and dump the leftover mixture on the grouting pipe layer to prevent damage to the glass fiber grouting pipe; The back glue of glass fiber grouting pipe is easily soluble in water, the temperature of the road surface is required to be between . Therefore, the relative displacement trend or relative displacement will occur between the narrow two, which will then generate friction. This friction is generally called 'surface friction'.


Zhang BoliAdvance small conduit in tunnel constructionIt is suggested that you should start from the source to reduce mechanical accidents



However, not all grouting pipe products can achieve this effect. Some inferior grouting pipe products not only fail to achieve the expected effect in use, but also have problems such as low grouting efficiency, pipe burst and pipe bending which seriously affect the grouting effect of the grouting pipe and the progress of the whole project. The quality of grouting effect comes from the selection of high-quality grouting pipe products. Shengpeng grouting pipe is a good choice for you to choose grouting pipe products because of its high strength, awesome, simple connection and high cost performance! Grouting pipe the grouting pipe is a kind of geosynthetic material formed by ultrasonic welding, which is composed of a steel plastic composite reinforced belt (built-in high-strength carbon spring steel wire (stress material) and wrapped with polyethylene resin (protective material) and arranged at right angles to the plane longitude and latitude. It is a comprehensive product of existing rigid reinforcement (flat steel strip, ribbed steel strip, galvanized steel strip, stainless steel strip, reinforced concrete strip, plastic grouting pipe warp knitted grouting pipe, etc.). Because of its high tensile strength, low elongation (≤ %), small creep, and strong interlocking and occlusive effect on the soil, restrict the lateral displacement of the soil, overcome the uneven settlement of the soil, greatly enhance the bearing capacity of the foundation and improve the overall performance of the foundation; It can be widely used in road engineering, railway engineering retaining structure, dam engineering, water conservancy engineering and tunnel engineering; It has remarkable safeguard effect and good social and economic benefits against rutting and pavement cracking.The single liquid silicification method is applicable to reinforce collapsible loess with permeability coefficient of . ~ m/d and silty fine sand with permeability coefficient of . ~ m/d.Grouting pipe grouting mainly improves the bearing capacity of piles from these two aspects Grouting is carried out through the grouting pipe embedded in the pile body. The slurry integrates the soil and slurry around the pile body through penetration, splitting and compaction, so as to improve the physical and mechanical properties of the bearing layer of the pile body Especially for the ballast at the bottom of the pile,Zhang BoliAdvanced small conduit factory, grouting can improve or eliminate the adverse effect of the ballast at the bottom of the pile on the end bearing capacity through the replacement, compaction and consolidation of the ballast by the slurry.II During the drilling process of the bored pile, there will be a certain gap between the pile retaining wall and the surrounding soil layer, which will lead to the decrease of the pile side friction and affect the bearing capacity of the pile When the grouting pipe is used at the pile end for grouting, the slurry will permeate, fill and compact along the side of the pile under the pressure, so as to complete the replacement of the mud skin around the pile and the filling of the gap, such as greatly improving the pile side friction resistanceWhich one is better,The foundation pit excavation shall strictly follow the principle of 'layered excavation'. The support erection shall be closely coordinated with the earthwork excavation. During the excavation, the earthwork near the grouting pipe shall be excavated by the central trenching method to prevent the machinery from colliding with the support; The earthwork near the slope protection pile shall be excavated manually with small machines and tools. It is forbidden to collide with the grouting pipe and bored pile by mechanical excavation. After the earthwork is excavated to the design elevation the grouting pipe shall be erected and prestressed in time to reduce the exposure time without support.In recent years, there have been frequent natural disasters, such as mountain slides, floods, earthquakes, fires, etc. we are so small in the face of natural disasters that we can only devote our efforts to normal prevention and post disaster rescue. The grouting pipe can reduce the damage caused by these natural disasters.Grouting pipe is an expert in road construction. It can connect the subgrade as a whole and improve the bearing capacity of the subgrade. When encountering natural disasters, the subgrade will not be greatly damaged due to natural disasters so that we can save more people in the rescue work. The grouting pipe can also play a great role in slope protection. The use of the grouting pipe can well prevent the landslide of mountain soil and debris flow disasters. Through many years of practical experience, it has been proved that the roads that usually use the grouting pipe are far more than the same period of projects in terms of service life and quality. Thus reducing the casualty rate. Grouting pipe is a kind of excellent geosynthetics used for Pavement Reinforcement, old road reinforcement,Zhang BoliAdvance small conduit and pipe shed, subgrade reinforcement and soft soil foundation reinforcement. It has become an irreplaceable material in the application of asphalt pavement reflection crack treatment. This product is a semi-rigid product made of high-strength alkali free grouting pipe, which is made of mesh base material through internationally advanced warp knitting process and surface coating treatment. It has high tensile strength and low elongation in both longitude and latitude, and has excellent properties such as high temperature resistance, low cold resistance, aging resistance and corrosion resistance. It is widely used in asphalt pavement, cement pavement and subgrade reinforcement railway subgrade, embankment slope protection, airport runway, sand prevention and control projects. Grouting pipe laying and fixing of grouting pipe laying of glass fiber grouting pipe can be carried out by special equipment refitted from tractors or automobiles, or manually.Causes of wrinkling: the blanking specification of pipe joint is too long.


Zhang BoliAdvance small conduit in tunnel constructionIt is suggested that you should start from the source to reduce mechanical accidents



The grouting pipe is a patented product. Compared with similar products in the market, it has higher tensile resistance and better sealing performance.Let's see,The grouting pipe at the tensioning end has good anchoring energy and self anchoring energy. Grouting pipe is generally used for tensioning. The grouting pipe at the tensioning end is composed of four parts: clip, anchor plate, anchor base plate and spiral reinforcement. The clip is the key part of the anchoring system. It is two-piece and made of high-quality alloy steel.A -m long orifice pipe is generally installed at the opening of the grouting hole to prevent possible hole collapse, and to play a guiding role in drilling. During grouting, it is used to install an orifice closing device to prevent grout leakage. It has good flexibility. The pipes can be coiled when they are produced, so that the number of joints in the pipe network can be reduced. It can be laid according to the terrain, easily bypass obstacles, and is convenient for construction.Zhang Boli, the axis deviation shall be ≤ cm, and the bearing capacity of the support joint shall meet the design requirements. When connecting the grouting pipes, bolts must be installed symmetrically and tightened in sequence. Meanwhile, in order to prevent excessive deflection of the grouting pipes when axial force is applied, the deflection must be corrected to the horizontal before axial force is applied.The grouting pipe without shaft roll packaging is tapped and paid off from the inner ring in the vertical state, and the drawn out pipe is spring shaped and automatically straightened. Takeout direction: the spiral direction of the spring shape after takeout is consistent with the twisting direction of, otherwise fried dough twist or disorder will occur. Welding is strictly prohibited during use, because the strength of the welding point is much lower than that of the steel itself, and it is easy to cause broken wires at the welding point during tensioning. When the grouting pipe adopts circular reinforcement arrangement, its bending radius shall not be less than times of the diameter.In recent years, there have been frequent natural disasters, such as mountain slides, floods, earthquakes, fires etc. we are so small in the face of natural disasters that we can only devote our efforts to normal prevention and post disaster rescue. The grouting pipe can reduce the damage caused by these natural disasters.Grouting pipe is an expert in road construction. It can connect the subgrade as a whole and improve the bearing capacity of the subgrade. When encountering natural disasters, the subgrade will not be greatly damaged due to natural disasters, so that we can save more people in the rescue work. The grouting pipe can also play a great role in slope protection. The use of the grouting pipe can well prevent the landslide of mountain soil and debris flow disasters. Through many years of practical experience, it has been proved that the roads that usually use the grouting pipe are far more than the same period of projects in terms of service life and quality. Thus reducing the casualty rate. Grouting pipe is a kind of excellent geosynthetics used for Pavement Reinforcement, subgrade reinforcement and soft soil foundation reinforcement. It has become an irreplaceable material in the application of asphalt pavement reflection crack treatment. This product is a semi-rigid product made of high-strength alkali free grouting pipe, and has excellent properties such as high temperature resistance, low cold resistance, aging resistance and corrosion resistance. It is widely used in asphalt pavement, cement pavement and subgrade reinforcement, railway subgrade, embankment slope protection, airport runway, sand prevention and control projects. Grouting pipe laying and fixing of grouting pipe laying of glass fiber grouting pipe can be carried out by special equipment refitted from tractors or automobiles, or manually.


Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms