Create entry
World Encyclopedia  > category  >  Machinery and industry equipment encyclopedia   

VaninenFixed stage elevatorWhat is the right size

release time: 2024-04-18 07:07:17

b. When the old elevator cannot start: due to the inability to enter the shaft, limited data can only be obtained from outside the shaft to determine whether it is non-standard (if there is a high platform in the machine room, the plane size of the shaft can be measured in the machine room,VaninenUnloading hydraulic tipping machine,VaninenPrice of 5-story household elevator, but it is not accurate enough) for elevator quotation negotiation reference. In this case, the signing of the contract should state that the shaft rectification and costs are the responsibility of the user. For uncertain shaft structures and dimensions, users should be reminded to provide them to the elevator after the old elevator or notify the elevator to take measurements before the new elevator is put into operation.There is a dedicated fire telephone in the fire elevator car.Vaninen,Aircraft weighing tens or hundreds of tons in the elevator hangar are vertically lifted onto the airport runwayMeasurement of elevator shafts in new construction projects under different on-site conditions: When the building design is not yet completed,VaninenFixed lifting stage, the operator only needs to provide the user with the standard elevator layout of the required elevator specifications, and the user entrusts the design department to design the elevator shaft. When the architectural design has been completed, is under construction, or has been completed, it must be determined based on the current construction or measured dimensions. If the original civil design of the shaft needs to be modified, the user should entrust the architectural design department to make the shaft design modification based on the layout provided by the elevator.Krasnodar,The door closing button has no self maintenance function. During the designated maintenance period, the elevator components in operation are inspected, refueled, dust is removed, and safety devices are debugged. Including non-destructive testing and maintenance of elevator traction steel wire ropes.To implement the arrangement of escalators and provide feedback, in order to determine the configuration of certain shared devices, the order of shipment, and the alignment of handrail turns during continuous arrangement.Measure the beam edge distance between the upper and lower support beams. The measurement is to suspend the line from the upper support point to the ground for positioning, and then measure the horizontal distance from the positioning point to the edge of the lower support beam.


VaninenFixed stage elevatorWhat is the right size



  “& rdquo; Elevator shaft: The design conditions are provided by the user to the architectural design department. The architectural design department analyzes whether the on-site pit depth, top floor height, reaction force etc. can meet the installation requirements of the elevator, as well as which building structures are needed (such as smashing stairs or floors), and develops a renovation construction plan. If it is indeed necessary to change the elevator structure due to civil engineering conditions (such as car size, door opening width, etc.), then consider the non-standard design of the elevator.Slide elevators are installed inside buildings and are often used parallel to buildings and sidewalksPlease note that there should be a space of over mm left on both sides of the escalator, there is no restriction between the two escalators.quality standard,The safety monitoring machine room environment screen cabinet main power switch traction wheel speed limiter shaft and pit guide rail layer door and car counterweight should be reliably fixed with pressure plates to prevent loosening.In the event of a fire when instructed by the fire center or the dedicated operation button of the first floor firefighter to enter the firefighting state, the elevator should immediately stop on the floor without opening the door return to the first floor station, and automatically open the elevator door if it is in the upward direction.The front room of the fire elevator is equipped with indoor fire hydrants.


VaninenFixed stage elevatorWhat is the right size



Measure the length, width, and observe whether there are grooves and embedded parts at the support beam.Where can I find it?,The shaft for updating the old elevator: The measurement of the shaft for the old elevator is the same as the shaft that has just been constructed. When the old elevator is not yet in use, try to obtain relevant data outside the shaft such as the size of the machine room, floor height, and net size of the door opening. There are two situations when the old elevator is not yet in use: a. When the old elevator can start: in this case, the elevator technician must cooperate in measuring the shaft! And be sure to pay attention to safety! The elevator technician opens the hall door on the first floor and initiates maintenance operations to drive the car above the second floor. The measurement personnel open the floor door on the first floor to measure the pit data, paying attention to recording the pit size and the wall structure of the first floor, such as whether the hall door is centered, whether there are brackets, whether there are special structures on the shaft wall, the spacing between ring beams, and the position of embedded parts. Then, the measuring personnel and elevator technicians take the elevator to the top floor. After measuring the machine room, the measuring personnel, with the cooperation of the technicians, go up to the car roof and start the elevator at a maintenance speed. When the car roof is slightly lower than the sill of the second floor hall door, the parking lot stops. During this process, the measuring personnel observe and measure the full travel of the shaft from the top floor, mainly the height of the floor, while recording the measurement (safety must be paid attention to, and special attention should be paid to moving parts such as counterweights and wire ropes).If there is a reserved shaft in the villa residential area, the appropriate car model can be selected by comparing the width and depth of the elevator car based on the size, width, and depth of the shaft. If there is no reserved shaft, you can first choose the model of the elevator and create a new shaft based on the required reserved size space for different models.During the use of elevators, some elevator users seek temporary workers or unqualified companies for elevator maintenance in order to reduce costs and save funds. Once safety issues arise, even the responsible unit cannot be found. If the maintenance is carried out by elevator manufacturers or qualified professional companies, on the one hand, the maintenance technology and quality are guaranteed, and on the other hand, if any problems occur, someone is also responsible.Vaninen,The compensation chain and rope shall not collide with the shaft or other components during the operation of the elevator.Cleaning and cleaning of elevator car guide shoes. As is well known, the guide shoe runs on the guide rail, and there is an oil cup on the guide shoe. To ensure that the elevator does not make any noise during operation, and the cabin should be cleaned thoroughly.Tower style residential buildings above; Residential units and corridors with twelve or more floors; Other Class II public buildings with a building height exceeding meters; High rise buildings with elevators exceeding meters in height; The functional fire elevator has a front room. The area of the independent fire elevator front room is: the front room area of the residential building is greater than square meters; The front room area of public buildings and high-rise factory (warehouse) buildings is greater than square meters. When the front room of the fire elevator is shared with the smoke proof staircase, its area is: the area of the shared front room in residential buildings is greater than square meters, and the area of the shared front room in public buildings and high-rise factory (warehouse) buildings is greater than square meters.


Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms