Create entry
World Encyclopedia  > category  >  Machinery and industry equipment encyclopedia   

ColumbusDescent machinePromote the growth of joint ventures

release time: 2024-04-24 20:05:55

The use of standard section connecting bolts should comply with the user manual and specification requirements.To meet the needs of stage craftsmanship and layout; Product; In the music and dance theater stage arranged in a zigzag pattern, auxiliary lifting platforms are often arranged in front, back, left and right of the main stage lifting platform. The side and rear auxiliary lifting platforms are used for the smooth opening of the side platform and rear vehicle turntable, so that the entire platform does not have a height difference while the front auxiliary lifting platform is used to place the rear vehicle turntable near the platform entrance. The leveling and lifting platform below the side platform and rear vehicle turntable can be used to level the platform after the side platform or rear vehicle turntable is driven out, ensuring the safety of the cast members.Columbus,Non automatic reset upper and lower limit switches should be installed at both the upper and lower ends of the stroke,ColumbusHand propelled electric elevator,When the door is closed, except for the gap between the lower part of the door that should not exceed mm, any through-hole and opening size related to the distance between any door and adjacent moving parts, as well as the gap around the door or the gap between parts, should comply with the provisions of Table of GB -.Yagoua, it can ensure that the equipment does not tilt during operation. Gear and rack electric lifting mechanism: precise transmission and high cost.High lifting height, using side mounted oil cylinders, stable operation, noise free, easy maintenance, and longer service life.Setting requirements: For construction electric elevators with foundations installed on roof slabs, floors, or other lower suspended structures, the bearing capacity of the foundation support structure should be checked. Click here to download the construction technical information for free. Basic drainage facilities should be installed.


ColumbusDescent machinePromote the growth of joint ventures



Acceptance: Concrete strength grade C, strength testing report.PoleSetting requirements: The landing door should be standardized and tooled.Variable costSetting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts, it is advisable to place the screw at the bottom and the nut at the top.Emergency manual valve: In case of power failure, it can cause the car to descend to the nearest floor position and open the doorBefore installation, the installation unit should confirm that the foundation, foundation bearing capacity, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form,ColumbusElectric screw elevator, and concrete strength report.


ColumbusDescent machinePromote the growth of joint ventures



Small safe operation distance: Circuit voltage (kV) of external power lines<~~~ Small safe operation distance (m) Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.how much,Secondly, the lifting platform is driven by electrical energy and lifted by the hydraulic system. During operation, it is necessary to avoid irregular operations. To ensure the normal and orderly operation of the lifting platform and achieve the ideal unloading level, timely inspection of various functions is essential.The down travel (limit) switch should be of the automatic reset type.When the horizontal distance between the edge of the cage and the edge of the landing or between the cage and the landing door is greater than mm and there is no effective protection from other structures, the side protection device for the landing entrance should be equipped.Columbus,The safety notice board for construction electric elevators should be prominently placed on the hanging cage for the rated load capacity and rated number of passengers of the construction electric elevator. It is strictly prohibited to use construction electric elevators beyond the rated load capacity or rated number of passengers.The foundation production and acceptance of electric elevators for foundation construction should comply with the user manual and regulatory requirements.The scissor type electric elevator is a widely used high-altitude operation special equipment. Its scissor mechanical structure ensures high stability of the lifting platform, wide working platform, and high bearing capacity, making the high-altitude operation range wider and suitable for multiple people to work simultaneously. It makes high-altitude operation more efficient and safer


Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

If you think this entry needs to be improved, please edit

Previous GwogovProduction of simple hydraulic elevatorsEssence    Next KarlsruheAjacchoTechnology of smelting waste residue

Synonym

No synonyms