Create entry
World Encyclopedia  > category  >  Building Materials Encyclopedia   

Munich Lim AirportGrouting pipeWhat are the general value materials

release time: 2024-04-27 04:37:54

It has good air tightness, low gas permeability, strong sealing and no leakage.When the grouting pipe is laid, it shall be kept flat and tight without wrinkling, so that the grouting pipe has effective tension. After laying, it shall be rolled again with a clean steel wheel roller. Most urban roads use glass fiber grouting pipes with self-adhesive. The diameter of the glass fiber grouting pipe is . ~ times of the maximum particle size of the asphalt concrete surface aggregate. The ultimate tensile strength should be greater than kN / m, so as to give play to the anti reflection crack performance of the glass fiber grouting pipe. It can also ensure the shear resistance and adhesive force of the adhesive layer of the glass fiber grouting pipe.Munich Lim AirportGrouting classification (I) grouting construction before and after the exposure of water bearing rock and soil layer is classified as follows: Pre grouting: the grouting works carried out before the shaft, tunnel, basement and other structures are dug or when they are close to the aquifer are called pre grouting. Ground pre grouting and working face pre grouting are common in the coal industry. The pre grouting method is used for water plugging and reinforcement of rock and soil to prevent accidents in advance.The longitudinal overlapping width of grouting pipe and grouting pipe shall not be less than cm, and the transverse overlapping width shall not be less than cm. The former shall be placed on the latter according to the asphalt paving direction. After laying the glass fiber grouting pipe, fix the glass fiber grouting pipe with high-quality cement nails and fixed iron sheets with a size of mm, mm and a thickness of .mm. The fixed spacing can be determined according to the actual construction situation.Kabare,?Appropriate measures shall be taken to prevent surface water, curing water and garbage from falling in. When necessary, a sump shall be set near the post cast strip of the base plate in combination with the design of the basement plane drainage system to facilitate the final cleaning before the grouting pipe is cast. When advance water stop is not used, a sump shall be set, which can be set in the basement according to the above method, or set outdoors as a temporary facility. Usually, and there are many methods for the grouting pipe to stop water in advance. It should be noted that the design unit should participate in the review of the construction organization design of the basement so as to determine a complete implementation scheme of advanced water stop before the excavation of the foundation pit and the pouring of the cushion. Otherwise, the design modification requirements will be put forward only when problems are found in advance water stop during construction, which will affect the integrity and rationality of the whole water stop scheme.The grouting pipe diffuses the load on it. When the reinforced soil is loaded, the grouting pipe has a high bond with the soil, and has a mutual embedding effect with the soil, showing better tensile performance. The tensile stress of the soil is transmitted to the grouting pipe, making the reinforced soil a tensile member, which can change the stress from the vertical direction to the horizontal direction, spread the load stress evenly to a large base range, enhance the overall tensile strength of the soil, and effectively improve the stress distribution of the pavement structure. The strength of high tensile reinforced soil is far higher than that of unreinforced soil, greatly improving the bearing capacity of the soil.


Munich Lim AirportGrouting pipeWhat are the general value materials



The grouting pipe is specially used as a channel for the depth detection of pile foundation and for structural stress calculation. The grouting pipe is a small pipe, but this small pipe meets the standard sensitivity of sound reception. As long as there is a small sound, a channel that allows the ultrasonic probe to be normally placed at the pile bottom is reserved, which is not considered in the structural stress calculation.Process flow: the drilling machine is in place → drilling → mud injection → casing running → continuing drilling → slag removal → hole cleaning → lifting and placing the reinforcement cage → bottom cleaning by water injection → inserting the concrete conduit → pouring concrete → pulling out the conduit → inserting the pile top reinforcement. There are single liquid silicification, double liquid silicification, aerated silicification and electric double liquid silicification. After the two pipes are connected by using the deformation of the grouting pipe, the kneading part of the joint is large at both ends and small in the center, so that the joint is stuck at one time, avoiding the possibility of loose union. The grouting pipe has proper, and the protrusion is circular arc with small protrusion, which is useful to avoid collision with conduits, vibrators, etc.Honest service,They shall be connected as a whole in the factory as far as possible. If it is necessary to connect on site due to manufacturing process, transportation conditions, etc., hot press vulcanization (grouting pipe) or welding (plastic grouting pipe) shall be used. The joint appearance shall be smooth and smooth, so as to ensure that on-site connection is only carried out in straight sections during construction. Flexible material with sufficient deformation capacity and good adhesion with concrete.Among the many imported projects, the development of the production technology of automobile door and window sealing strips is the most representative. Through the introduction of sealing strip production lines from Japan, Germany, Italy, Britain and other countries up to now, domestic manufacturers have introduced more than sealing strip production lines. In addition to pure rubber sealing strips, sealing strips of various composite structures, metal skeleton and various rubber composite sealing strips, rubber and plastic composite sealing strips can be produced. At present, the overall level of China&#;s sealing strip production technology has basically reached the level of foreign countries in the s, and has become a grouting pipe. Because some projects are not easy to detect when they are manufactured, and the quality of the grouting pipe as a channel for testing instruments has become crucial. If the quality of the grouting pipe is poor, it will bring many hidden dangers. Steel grouting pipe material which has the characteristics of thin pipe wall, steel saving, impermeability, pressure resistance and high strength, is generally used for post tensioned reserved holes in prestressed structures. When the grouting pipe is used, it can be directly bound to the reinforcement framework. Because the grouting pipe is very light, it is very convenient to operate. However attention should be paid to the balance of its axis during installation.When the grouting pipe is installed, the axis deviation shall be ≤ cm, and the bearing capacity of the support joint shall meet the design requirements. When connecting the grouting pipes, bolts must be installed symmetrically and tightened in sequence. Meanwhile, in order to prevent excessive deflection of the grouting pipes when axial force is applied, the deflection must be corrected to the horizontal before axial force is applied.


Munich Lim AirportGrouting pipeWhat are the general value materials



They shall be connected as a whole in the factory as far as possible. If it is necessary to connect on site due to manufacturing process, transportation conditions, etc., hot press vulcanization (grouting pipe) or welding (plastic grouting pipe) shall be used. The joint appearance shall be smooth and smooth, and the tensile strength shall not be less than % of the base metal. The so-called 'overlapping' without any treatment is absolutely not allowed. All kinds of cross connection points of grouting pipes shall be made of accessories produced by our new rubber products factory, so as to ensure that on-site connection is only carried out in straight sections during construction. Flexible material with sufficient deformation capacity and good adhesion with concrete.production costs,A short section of screw end rod is welded on both ends of a single prestressed thick steel bar, and the nut and backing plate are sleeved to form the simplest grouting pipe. The pretension force is transmitted to the nut through the bearing force on the threaded slope of the screw end rod, and then to the concrete components around the reserved hole crossing through the base plate.Let&#;s take a look at the prestressed machines and tools. The small editor of prestressed machines and tools reminds everyone that the screw end rod is made of cold drawn or heat-treated reinforcement, and the thread is fine teeth. The welding between the end rod and the prestressed reinforcement should be carried out before the cold drawing of the prestressed reinforcement. This grouting pipe can be used at the tensioning end and the fixed end. A general jack is used for tensioning, and the jack pull rod (with internal thread at the end) is tightened on the thread of the screw end rod for tensioning. After tensioning,Munich Lim AirportGrouting seamless pipe, tighten the nut and anchor the rebar. The advantages of this grouting pipe are relatively simple, and when the jack returns oil after the grouting pipe, the prestressed reinforcement basically does not slide. If necessary, facilitate re tensioning. The disadvantage is that the accuracy of the length of prestressed reinforcement is high, and it cannot be too long or too short, otherwise the thread length is not enough. When reinforcing collapsible loess, sodium silicate solution with % sodium chloride and concentration of % ~ % is used. After the solution is pressed into the soil layer, sodium ions will react with calcium ions in water-soluble salts of the soil to form silicic acid gel between soil particles and on their surfaces, increase the cementation between soil particles, and harden the soil. The ultimate compressive strength can reach . ~ .MPa. When strengthening the silty fine sand, a certain amount of phosphoric acid (density is added to the sodium silicate solution (density - with a low concentration. The solution is chemically reacted in the soil to harden the soil, and its ultimate compressive strength can reach .-.mpa.The grouting pipe diffuses the load on it. When the reinforced soil is loaded, the grouting pipe has a high bond with the soil, and has a mutual embedding effect with the soil, showing better tensile performance. The tensile stress of the soil is transmitted to the grouting pipe making the reinforced soil a tensile member, which can change the stress from the vertical direction to the horizontal direction, spread the load stress evenly to a large base range, and effectively improve the stress distribution of the pavement structure. The strength of high tensile reinforced soil is far higher than that of unreinforced soil greatly improving the bearing capacity of the soil.Munich Lim Airport, The grouting pipe is used as the pipe for grouting at the bottom of the pile. The test shows that the bearing capacity of the cast-in-place pile treated with the pile bottom grouting can be greatly improved At the same time, the grouting pipe can also be used as the pipe for the defect washing and grouting treatment of the accident pile. At this time, it is necessary to take measures to punch the pipe at the defect position where grouting is required. The classification of the grouting pipe can be divided into three categories according to the pipe materials: the advantages of steel pipe steel pipe are that it is easy to install, and it can be welded on the reinforcement frame by electric welding, which can replace part of the reinforcement section, and because of the large rigidity of the steel pipe After embedding,Munich Lim Airport42 small catheter, the parallelism and straightness can be basically maintained. At present, many large-diameter cast-in-place piles use steel as the grouting pipe. However, the price of steel pipe is relatively expensive: steel corrugated pipe steel corrugated pipe is a better grouting pipe material. It has the characteristics of thin pipe wall, less steel, impermeability, pressure resistance, high strength and good flexibility. It is usually used for post tensioning reserved holes in prestressed structures: when used as grouting pipe. It can be directly bound to the reinforcement framework soil, and the joint can be connected with a larger corrugated sleeve. Since the bellows is light, but attention should be paid to keeping its axis straight during installation.Answer: it varies according to the model and elasticity of the grouting pipe,Munich Lim AirportSmall conduit manufacturer, after the completion of the construction of the project, because some construction personnel did not take protective measures after the completion of the grouting pipes, the project was damaged due to some external factors. In order to help users effectively improve the construction quality of the grouting pipes, the following article introduces the protective measures that should be taken after the completion of the construction of the waterproof layer of the grouting pipes. For various engineering designs, waterproof and water stop shall be carried out throughout the whole process of grouting pipe until the backfilling soil is completed.


Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms