Create entry
World Encyclopedia  > category  >  Building Materials Encyclopedia   

Ren QiuFixed guide rail lifting cargo elevatorEffective treatment method

release time: 2024-04-29 00:34:49

Whether it is used outdoors or indoors some small problems will inevitably appear after a long period of time. At this time, what we should do is to maintain and maintain the elevator. How to follow the steps correctly It has become a difficult problem, and I will answer it with you.Frequently check the humidity of the aerial work vehicle that is prone to water accumulation. It is inevitable that the aerial work vehicle is driving in rainy and snowy weather,Ren QiuProduction of lifting cargo elevators, or on muddy roads. The bottom and some gaps and indoor floors are easy to accumulate sludge. If the owner does not clean it in time, this will hide the moisture. Therefore, the outer edge of the wheel hub, the door, the corner of the bottom of the trunk, the key hole and the wiper frame and other areas should be checked regularly, and the drainage holes in the door and various parts should be kept unblocked to ensure that the car seat covers,Ren QiuWarehouse elevator, carpets and floors are protected from humidity. Rusty fittings.Ren Qiu,The daily maintenance of the freight elevator should be carried out by a professional team (issued by the State Administration of Quality Supervision).What is the new price of a fixed lift? Professionally improve the quality assurance of the freight elevator factory. The preferential activities are in progress,Ren QiuIndustrial cargo elevators, and new and old customers are welcome to come to consult.Manaus,Before the elevator manufacturer connects the motor to the elevator, please screw on the mounting bolts at any diagonal position first, then screw on the other two mounting bolts at diagonal positions, and then tighten the four mounting bolts one by one. Finally, tighten the tension bolts. All tightening bolts need a torque wrench to fix according to the marked fixed torque data and check whether the lift and lifting platform are used.How should we check the construction site of the construction hoist? you know?The last thing to note is that compared with the lifting platforms in some places, protective fences are generally added on the platforms. Since the lifting platforms are special equipment, the National Quality Inspection Bureau is very strict on this piece of inspection. All must be dismantled, so when the personnel ask you if you want to add a guardrail, don't blindly refuse, and consider whether it is necessary according to the site of use. In addition you must have the 'People's Republic of Special Equipment Manufacturing License' and the 'People's Republic of Special Equipment Installation, Transformation and Maintenance License' to produce, install, and maintain. Therefore, you must ask whether the manufacturer has these two certificates.System: explosion-proof electronic control system, remote control system, P IC system.


Ren QiuFixed guide rail lifting cargo elevatorEffective treatment method



Test the freight elevator every day to see if the freight elevator can operate normally.It is strictly forbidden to use helmets beyond the validity period. The validity period of helmets is counted from the date of delivery. Plastic helmets shall not exceed two and a half years, and fiberglass helmets shall not be used for more than three and a half years.The parts such as reduction box, gearbox, external gear and hydraulic oil are all in accordance with the requirements in the table.Word of mouth recommendation,Before using the aerial work platform, it is necessary to confirm whether the outriggers are well supported, refer to the level beads on the equipment to judge and debug, and then proceed with the operation; the rollers and slideways confirm whether the roller slideways of the hydraulic lifting platform are dry, and if there is When drying the site an appropriate amount of butter should be added to ensure the smoothness during operation and to avoid head-to-head wear between mechanical parts.Regular maintenance Regularly check whether the circuit system of the hydraulic lifting platform is loose, and check whether the wires and cables are aging and damaged, which may cause leakage of the line. If there is, it should be repaired in time to avoid electric shock.It is strictly forbidden to switch the electric control switch with wet hands. Many people tend to ignore this detail. Although the safety voltage of the hydraulic lifting platform is below V, if you touch the power supply with your hands, it may cause lifting failure in light cases, or electric shock accidents in severe cases.


Ren QiuFixed guide rail lifting cargo elevatorEffective treatment method



Before the elevator manufacturer connects the motor to the elevator, please make the keyway of the motor shaft perpendicular to the tightening bolt. In order to ensure uniform force, please screw on the mounting bolts at any diagonal position first, but do not tighten them tightly, then screw on the other two mounting bolts at diagonal positions, and then tighten the four mounting bolts one by one. Finally, tighten the tension bolts. All tightening bolts need a torque wrench to fix according to the marked fixed torque data and check whether the lift and lifting platform are used.How should we check the construction site of the construction hoist? you know?Installation materials,Test the freight elevator every day to see if the freight elevator can operate normally.What are the installation precautions for the elevator? The elevator folds the fence and the cage to clean the foundation surface, and installs the anchor bolts. The force-bearing surface between the large nut and the floor to reduce the impact of the nut on the floor; insert steel plate gaskets of different thicknesses between the chassis and the foundation stone at the anchor bolts to adjust the verticality of the guide rail frame; install three standard sections and measure them with theodolite The verticality of the guide rail frame ensures the verticality of each supervisor of the guide rail frame in two directions. After the guide rail frame is adjusted vertically tighten the anchor bolts; adjust the verticality of the fence door frame as above, and tighten the rest of the anchors. Bolts; install buffer springs; connect the other half of the fence to the front half with bolts; adjust the verticality as above, tighten the anchor bolts, and loosen the brake on the motor in the cage. (For SC/ type, first install the cage and then install the drive plate). All kinds of freight elevator factories have formal qualifications, welcome to inquire by phone, and sincerely invite cooperation!As for the guide rail elevator installed outdoors, so special attention should be paid to regular maintenance and inspection to avoid accidents.Ren Qiu,Before using the aerial work platform, it is necessary to confirm whether the outriggers are well supported, refer to the level beads on the equipment to judge and debug, and then proceed with the operation; the rollers and slideways confirm whether the roller slideways of the hydraulic lifting platform are dry, and if there is When drying the site, an appropriate amount of butter should be added to ensure the smoothness during operation and to avoid head-to-head wear between mechanical parts.Outriggers: mechanical outriggers, hydraulic outriggers, ordinary hand-operated outriggers, compared with the lifting platforms in some places, protective fences are generally added on the platforms. Since the lifting platforms are special equipment, the National Quality Inspection Bureau is very strict on this piece of inspection. All must be dismantled, so when the personnel ask you if you want to add a guardrail, and consider whether it is necessary according to the site of use. In addition, you must have the 'People's Republic of Special Equipment Manufacturing License' and the 'People's Republic of Special Equipment Installation, Transformation and Maintenance License' to produce, install, and maintain. Therefore, you must ask whether the manufacturer has these two certificates.


Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms