Create entry
World Encyclopedia  > category  >  Machinery and industry equipment encyclopedia   

SeksadElevating platform stageIn the face of different forms, different maintenance measures must be taken.

release time: 2024-05-06 16:16:28

The treatment of general civil engineering problems on escalator sites: the beam edge distance is too large: in this case, the length of the upper and lower platforms of the escalator can be increased to meet the actual dimensions of civil engineering. One platform can be extended on one side, attention should be paid to the length of the pit or the opening of the floor slab, which should also be lengthened at the same time. After the escalator is extended, the force on the upper and lower support points will also increase. If the edge distance of the beam increases too long, support needs to be added in the middle of the escalator truss. In addition changing the angle of the escalator from degrees to degrees can also make the beam edge distance longer.Cleaning and cleaning of elevator car guide shoes. As is well known, and there is an oil cup on the guide shoe. To ensure that the elevator does not make any noise during operation, it is necessary to regularly refuel the oil cup and clean the guide shoe,SeksadStage elevator, and the cabin should be cleaned thoroughly.Seksad, be careful not to step on the gap between the pedals, as not wearing shoes is more likely to be pinched by the toothed plate.  “& rdquo; Elevator shaft: The design conditions are provided by the user to the architectural design department. The architectural design department analyzes whether the on-site pit depth, top floor height, reaction force, etc. can meet the installation requirements of the elevator, as well as which building structures are needed (such as smashing stairs or floors), door opening width, etc.), then consider the non-standard design of the elevator.Bawku,Machine room power supply: The power supply should be three-phase V, HZ, and the lighting power supply should be single-phase V, HZ. The incoming line should be connected to the vicinity of the machine room entrance and equipped with an incoming socket. Specializing in product and renewable resource business, including: home elevator manufacturersBrick concrete structure elevator shaft: For unfinished brick structure shafts, users can be required to make a circle of beams at a certain height, arranged on three sides,SeksadSightseeing elevator household use, and disconnected on one side of the elevator entrance. The distance between the center heights of the beams depends on the product model, and should not exceed mm. The beam height should be mm, and the thickness should be the same as the wall. The lower ring beam is -mm away from the bottom of the pit, and the higher ring beam is -mm away from the lower surface of the shaft roof. The completed framework with a solid brick structure shaft can be equipped with steel plywood at the position of the fixed guide rail support frame. The position and size of the plywood are provided by the elevator, and the user is responsible for providing materials and construction. If the shaft structure is made of hollow bricks without ring beams, steel beams can be considered to be added between the frames for rectification.Maintenance of elevator hall doors and car doors. Elevator malfunctions usually occur on the elevator hall and car doors, so attention should be paid to the maintenance of the hall and car doors. One is to refuel the fuel on the upper sill of the door and keep it in good condition, so that the elevator will not make unpleasant noises during operation and the opening of the door. Pay attention to the inspection of the safety contact plate or light curtain type contact plate switch wire of the elevator, as the frequency of opening and closing the door in the elevator is high, which can cause damage to the switch wire. This requires maintenance personnel to inspect it every time they work, and replace it in advance to avoid users having doubts about the quality of the elevator product due to door issues.


SeksadElevating platform stageIn the face of different forms, different maintenance measures must be taken.



Brick concrete structure elevator shaft: For unfinished brick structure shafts, users can be required to make a circle of beams at a certain height, arranged on three sides, and disconnected on one side of the elevator entrance. The distance between the center heights of the beams depends on the product model and should not exceed mm. The beam height should be mm, and the thickness should be the same as the wall. The lower ring beam is -mm away from the bottom of the pit, steel beams can be considered to be added between the frames for rectification.The difference between home elevators and ordinary public elevators is that the focus of home elevators and ordinary public elevators is different and the user is responsible for providing materials and construction. If the shaft structure is made of hollow bricks without ring beams, the load capacity of home elevators does not exceed kg, which is much lower than that of ordinary public elevators. Home elevators do not need to consider the issue of passenger flow, and the lifting speed is slower, ensuring safety. The lifting speed is generally between . to .m/s, and running smoothly.Multiple elevator shafts can be connected and an - # I-beam can be fixed at a certain height between each adjacent elevator shaft, with the same position as the ring beam. The pit must be equipped with an isolation net that is mm above the ground level.assets,If the elevator is already on the first floor, immediately open the elevator door and enter the firefighter's dedicated state.Restore the command button function in the cabin for firefighters to operate.Brick concrete structure elevator shaft: For unfinished brick structure shafts, users can be required to make a circle of beams at a certain height, arranged on three sides, and disconnected on one side of the elevator entrance. The distance between the center heights of the beams depends on the product model, and should not exceed mm. The beam height should be mm, and the thickness should be the same as the wall. The lower ring beam is -mm away from the bottom of the pit, and the higher ring beam is -mm away from the lower surface of the shaft roof. The completed framework with a solid brick structure shaft can be equipped with steel plywood at the position of the fixed guide rail support frame. The position and size of the plywood are provided by the elevator and the user is responsible for providing materials and construction. If the shaft structure is made of hollow bricks without ring beams, steel beams can be considered to be added between the frames for rectification.


SeksadElevating platform stageIn the face of different forms, different maintenance measures must be taken.



Measurement of elevator shafts in new construction projects under different on-site conditions: When the building design is not yet completed, the operator only needs to provide the user with the standard elevator layout of the required elevator specifications, and the user entrusts the design department to design the elevator shaft. When the architectural design has been completed, and the site has not yet been constructed, is under construction, or has been completed, it must be determined based on the current construction or measured dimensions. If the original civil design of the shaft needs to be modified, the user should entrust the architectural design department to make the shaft design modification based on the layout provided by the elevator.How much does it cost?,The beam edge distance is too small: The method of shortening the lower platform is to shorten the total length of the escalator, but note that the range of shortening is very limited, generally not exceeding mm. Generally, the platform cannot be shortened because it contains equipment such as cabinets and motors. Change the angle of the escalator from degrees to degreesHome elevators are different from public spaces, such as professional home elevators, villa home elevators, home elevator manufacturers, small home elevators, and other special products. Old brands have advantages in price and guaranteed quality. Considering the limited installation space,SeksadBarrier free vertical lifting platform, lack of dedicated hoistways, and small lifting height, the design pursues simplicity and miniaturization, and the existence of computer rooms is not necessary. Long term promotion of home elevator manufacturers, old brands, price advantages, and guaranteed quality!The mechanical components of the elevator's traction machine require oil. There are two scales on the outer cover of the traction machine. Open the oil nozzle to check that the oil should be in the middle of the two scales. If the oil is lower than the lower scale, it means that the traction machine should be refueled. If not refueled, the elevator will not operate well for a long time, leading to the burning of the elevator traction machine and motor. After the elevator has been running for a long time, the oil should be replaced in a timely manner to keep the traction machine clean and in good condition.Seksad,Tower style residential buildings above; Residential units and corridors with twelve or more floors; Other Class II public buildings with a building height exceeding meters; High rise buildings with elevators exceeding meters in height; The functional fire elevator has a front room. The area of the independent fire elevator front room is: the front room area of the residential building is greater than square meters; The front room area of public buildings and high-rise factory (warehouse) buildings is greater than square meters. When the front room of the fire elevator is shared with the smoke proof staircase, its area is: the area of the shared front room in residential buildings is greater than square meters, and the area of the shared front room in public buildings and high-rise factory (warehouse) buildings is greater than square meters.When the normal power supply is cut off, the lighting inside the non fire elevator has no power, while there is still lighting inside the fire elevator.Tower style residential buildings above; Residential units and corridors with twelve or more floors; Other Class II public buildings with a building height exceeding meters; High rise buildings with elevators exceeding meters in height; The functional fire elevator has a front room. The area of the independent fire elevator front room is: the front room area of the residential building is greater than square meters; The front room area of public buildings and high-rise factory (warehouse) buildings is greater than square meters. When the front room of the fire elevator is shared with the smoke proof staircase, its area is: the area of the shared front room in residential buildings is greater than square meters and the area of the shared front room in public buildings and high-rise factory (warehouse) buildings is greater than square meters.


Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

If you think this entry needs to be improved, please edit

Previous SeksadSelf moving lifting platformWhat to know about    Next Montley15 meter elevatorWhat are the regular testing items

Synonym

No synonyms