Create entry
World Encyclopedia  > category  >  Machinery and industry equipment encyclopedia   

Ostholt660V to 380V three-phase transformerAnalytical use problem

release time: 2022-06-27 06:20:13

There are also many problems to pay attention to in the preventive measures and process of dry-type transformer damping. What are the key effects and functions of dry-type transformer damping and the corresponding preventive measures? Let's master and consult in detail with the small editor of the dry-type transformer manufacturer.Therefore, in the installation process of substation equipment, the lightning rod should be set according to the specific situation to prevent damage to the relay protection dry-type transformer caused by lightning. In addition, in the installation and use process of lightning rod, select reasonable types of lightning rod according to the operation situation to determine that they are in the same situation. In addition, during the installation of lightning rod, please connect all routes as far as possible to prevent other faults.Ostholt,There is a magnetic induction line crossing in the transformer core, which will cause induced electromotive force on the plan with the magnetic induction line. Because this electric flow creates a closed loop to generate an electric field and forms a vortex, it is called vortex. The existence of vortex makes the transformer core hot and consumes kinetic energy. This kind of loss is called vortex loss.Dry type transformerNaujoji Akmene,For kVA power engineering transformer, plastic parts are selected in the middle of iron core clamp and electromagnetic coil to keep the electromagnetic coil in a stable clamping state to reduce noise.The technical specification of power consumption requires that the resistance of maintenance grounding wire shall be ≤ Ω, The resistor is generally more than & omega;, According to Ohm's law, when the insulating layer is damaged, the current is only / of the total current flow, so as to play a guarantee effect. The higher the voltage, the smaller the resistance, in other words,OstholtTransformer temperature in high voltage distribution room, in the case of high voltage. We can care about the power transformer plant and master a lot of professional knowledge.If the volume of power transformer is too small, the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore, the rated capacity of the transformer should be selected according to the power consumption, which is not suitable for too large or too small.


Ostholt660V to 380V three-phase transformerAnalytical use problem



Power transformers are also used for testing, which are called test power transformers. They can be divided into inflatable, oil transformer, dry test and other test power transformers. They are the basic test equipment for communication AC compression test for many consumers such as power stations,OstholtDry type test transformer, power supply bureaus and scientific research institutions. According to the specifications of the Bureau of quality supervision, It is used to carry out insulation compressive strength test under required current for various electrical products, electrical components and insulating raw materials.The secondary inductive equipment of the distribution station (such as transformer, voltage transformer, automobile relay, AC etc.) operates normally. According to the AC current, buzz & rdquo; Sound. The operation staff of the transformer manufacturer should understand and grasp the characteristics of the noise. When the equipment has common faults the winding transformer core will send out a symmetrical rhythm and a certain tone & ldquo; Buzz, there will be noise and even & ldquo; Crackle & rdquo; The charging and discharging sound can distinguish the generation and characteristics of common equipment faults according to the music law and sound transformation when everything is normal and abnormal.If you want to check the activated carbon fiber for the hanging cover, first take out the low-voltage waterproof sleeve and the on load transformer power switch, then lower the bell cover anchor bolt of the large cover, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, wear round steel from top to bottom in the surrounding screw holes, and count the spacing and specifications for easy reinstallation. At the same time, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for mm, stop the lifting, stabilize the bell cover, and check the bearing capacity of the lifting core center of gravity and Jack. After everything is normal, lift it again until the bell cover exceeds the relative height of the body, and rotate the crane to place the bell cover on the clean skid.consumption,Dry type transformer manufacturerAfter hours of continuous trial operation with a certain load, and the transformer will turn to all normal operation.After tightening the loose bolts, seal the flange, and solve the bolts that are likely to leak, find the leakage point first, which can not be ignored. For the position with serious leakage, shovel or sharp punch can be selected. The leakage point can be riveted with special tools for metal materials. After manipulating the leakage, the treatment surface shall be cleaned and tidy. Polymer composite materials are mostly selected for dry consolidation. After dry consolidation,OstholtOil immersed transformer temperature, the goal of long-term treatment of leakage can be achieved.Quality improvement,Protective measures for damping of dry-type transformerIt is understood that in China, transformers have experienced the whole process of replacing many series products such as sss. As early as the middle and late s, urban power grids have been transformed all over the country, and S series distribution transformers have been used to replace S Series. In recent years, S and S commodities are gradually selected in large quantities in the transformation of urban and rural power networks in China, and their full load loss is % - % less than that of S transformer.In order to better reduce the probability of short-circuit fault of relay protection dry-type transformer, prevention and key are & ldquo; Prevention and Manipulation & rdquo; Is dominant.Ostholt,According to the condition of cracks, galvanized iron wire can be punched into the leakage or riveted with hammer. Then clean the leakage point with toluene and seal it with raw materials. Coated sand casting eyes can be sealed with raw materials immediately.Difference between dry-type transformer and oil immersed transformer:When the full load test is carried out and everything is normal

Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms