Bog Walk 1000 KVA power dry-type transformerWhy the temperature is high

release time: 2022-12-04 11:22:43

When sampling in bulk gasoline barrels, samples shall be selected according to % of the number of gasoline barrels, but not less than barrels. When sampling in batches of small and medium-sized pails or bottles, samples shall be taken according to % of the total number of barrels (bottles).The flange surface is uneven, the tightening bolts are loose, and the installation and processing process is wrong,Bog Walk 35kV oil immersed transformer, so that the bolts are not tightened well, resulting in oil leakage.Bog Walk ,According to statistics, to occupy the main global technical position, the transformer industry depends on two key data, commodity volume and voltage level. As early as & ldquo; Eleventh Five Year Plan; In the early stage, China has been a powerful country in the production, but it is not a big country.When oil samples are used, the safety and fire safety technical specifications on the spot shall be strictly implemented.Telerghma, there is more noise, and some even cause noise which seriously endangers everyone's no problem rest time and work. At this time, the dry-type transformer needs sound insulation treatment. There are many processes and key methods to deal with the noise of the common dry-type transformer. How should the noise of the dry-type transformer be solved? Or with the dry-type transformer manufacturer's network editor to simply understand it.Oil leakage of cast iron parts


Bog Walk 1000 KVA power dry-type transformerWhy the temperature is high



Dry type transformer oscillation is solved by applying vibration damping platform to dry-type transformer and carrying out low-frequency vibration reduction management, which can control the oscillation below .%,Bog Walk Oil immersed transformer oil storage tank, and then reduce the building structure noise transmitted by dry-type transformer oscillation.Hand touch method for transformer inspectionFault judgment of power transformerranking,In the electric field of the winding to the yoke, there must be a strong line breaking component, so that sliding flash charge and discharge may occur at a lower current. In order to better solve this disadvantage the appearance of the insulating parts between the winding and the iron yoke should be the same as that of the medium horizontal plane of the winding to the iron yoke insulation as far as possible, so as to reduce the electric field component intersecting with the insulating parts.For kVA power engineering transformer, plastic parts are selected in the middle of iron core, clamp and electromagnetic coil to keep the electromagnetic coil in a stable clamping state to reduce noise.The first step of the whole wave process calculation is to calculate the basic parameters of the Internet such as inductance, capacitance and resistor. The accuracy of those basic parameters does great harm to the calculation results of the whole wave process. For the inductance calculation, the good model is the solid model of infinite transformer core column, but there are many calculation methods.


Bog Walk 1000 KVA power dry-type transformerWhy the temperature is high



When the power transformer operates at full load, it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.Professional is king,Oil leakage of porcelain pot and laminated glass oil level gaugeThe appropriate power saving calculation formula should be derived from the following process: active power loss of large capacity transformer: load of large capacity transformer; PDK - short-circuit fault loss of large capacity transformer, kW. Active power loss of small capacity transformer: when a pump room is in normal operation, two pumps are started separately, and each pump is driven by kW motor, so the usual load is KW, CST = . One kva transformer was originally configured, and the capacity utilization rate introduced by the transformer manufacturer is only %Before no-load impulse closing, the transformer shall be placed for h,Bog Walk What are the test items of dry-type transformer, and the rising seat and waterproof sleeve installed with vent plug shall be deflated on time.Bog Walk ,Loose core screwWhen sampling from a small and medium-sized power transformer without a discharge pipe (or oil sample suspension plate) it can be in a power transformer such as a glass test tube when it is not in operation to extract the oil sample at the bottom, or it can be replaced by changing the oil.Brief introduction of zero line of power transformer