Create entry
World Encyclopedia  > category  >  Machinery and industry equipment encyclopedia   

KoboshburgLecheHow to judge the quality

release time: 2024-03-29 12:36:48

During loading and unloading, the horizontal distance between the edge of the cage door and the edge of the landing station should not exceed mm.Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, and at this position, the hydraulic ground should be - millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, or has foreign objects such as gravel, it should be replaced in a timely manner ( # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, remove the oil filter, clean it with compressed air,KoboshburgTampa , and then return it to the oil tank and connect the pipeline.Koboshburg,Setting requirements: Construction electric elevators should be equipped with a down travel (limit) switch. The down travel (limit) switch should be able to automatically stop the cage running at rated speed before reaching the lower limit switch.Safety grounding device. In order to protect against electrical equipment. The metal casing of electrical equipment and the metal structure of electric elevators should be equipped with a safety grounding device. The grounding wire should operate multiple wires, and the neutral wire should not be arbitrarily held as a safety grounding wire. Its grounding resistance should not exceed ohms; The power supply of the electric elevator can be cut off.Caconda,During normal operation, the horizontal distance between the closed cage door and the closed landing door should not exceed mm. Otherwise, measures should be taken to make it meet the requirements, or side protection devices at the entrance of the landing station that meet the requirements should be equipped. The distance between any opening between the side protection device and the hanging cage or landing door should not exceed mm.Work is essential, and the main protective accessories include safety belts guardrails, protective covers, platforms and stairs, etc.In order to meet the needs of contemporary audiences and achieve perfect effects, in addition to lighting and sound, stage machinery is particularly important on the stage. On the stage, there are suspension rods, suspension points, lighting bridges, lighting suspension cages, and fire curtains. Under the stage, there are lifting platforms, car platforms, turntables, and lifting orchestras. Some lifting platforms are equipped with turntables, or there are lifting platforms in the turntables. Various types of lifting platforms are equipped in professional opera houses, dance theaters, and many internationally renowned music halls. It has the functions of quickly changing scenery, meeting the needs of stage craft layout, meeting the needs of stage design and choreographers, creating special atmosphere and effects,KoboshburgBisegli, and changing the stage form according to the needs of the performance.


KoboshburgLecheHow to judge the quality



The L distance depends on the selected wall mount model.When adding hydraulic oil, it is also necessary to pay attention to the structure of the oil cylinder. Some oil cylinders are relatively complex internally, when filling, try to add as much as possible, and then test and run the machine empty to see if it reaches the rated position.During loading and unloading, the horizontal distance between the edge of the cage door and the edge of the landing station should not exceed mm.quality index,After the electric elevator passes the inspection, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.Setting requirements: Drainage measures should be set up for the foundation of construction electric elevators to ensure smooth drainage.With the continuous improvement of urbanization level in China, the number of high-rise buildings in urban areas has sharply increased, and the height of buildings has also continued to grow. This has created a demand for high-altitude lifting platform vehicles. Therefore in order to meet the needs of the domestic market and the public, efforts will inevitably be made to design and produce high-altitude lifting platform vehicles.


KoboshburgLecheHow to judge the quality



News Abstract: The development of the lifting platform industry will continue to grow in recent years! With the continuous development of electric lifting machinery for high-altitude operations in recent years, the products of electric lifting platform vehicles have been continuously improved, and various new technologies and materials have emerged, making the further development of lifting platform vehicles possible.Quality improvement,Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, and at this position, the hydraulic ground should be - millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky, or has foreign objects such as gravel, it should be replaced in a timely manner ( # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, remove the oil filter, clean it with compressed air, and then return it to the oil tank and connect the pipeline.When a single steel wire rope is excessively stretched, the Electrical safety device shall stop the operation of the electric lift.Installation and dismantling personnel and drivers should hold certificates to work.Koboshburg,KoboshburgProskov,Work is essential, and the main protective accessories include safety belts guardrails, protective covers, platforms and stairs, etc.Setting requirements: The quality of the standard section should meet the requirements of the product manual. Before installing the construction electric elevator, all components should be inspected, and standard sections and other components with severe wear and deformation should be replaced.Work is essential, and the main protective accessories include safety belts, guardrails, protective covers platforms and stairs, etc.


Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms