The secondary grouting pipe can only be grouted once and cannot be reused.Repetitive grouting pipe can be reused for many times. Long term grouting steel flower pipe, steel flower pipe grouting, pile foundation grouting pipe, grouting pipe manufacturer, old brand, the pipe core and the outer wall of the pipe shall be washed clean.
After the grouting hole is drilled, install and lower the grouting pipe, grout stop plug, mixer and other facilities in the hole.The grout stop plug grouting method is generally used for Rock Fissure Grouting. The grouting pipe is provided with a grout stop plug, which can close the upper part of the grouting section. The main construction steps are as follows: the grouting hole is drilled by a rotary drill. All grouting holes in the rock stratum are required to be drilled by coring in order to find out the and distribution of rock stratum fractures. The coring rate shall reach ~ % in the rock stratum and % in the broken rock stratum. The drilling cleaning fluid is mainly clean water. If the rock is broken and the hole collapse is serious, thin mud slurry can also be used as circulating fluid.Lezhe Steel pipeOff season demand goes out of the peak season, and price merchants follow up in the Mongolian circle,2024-03-2918:47:19Special slings shall be used for the lifting of horizontal members such as laminated plates, and the stress at each lifting point shall be uniform to avoid fracture due to uneven stress of members. Grouting method is to put some solidified slurry into the cracks or pores of rock foundation in order to improve its physical and mechanical properties. Professional grouting pipe, steel flower pipe, advance small pipe,Lezhe Steel pipe,Lezhe Seamless pipe,Lezhe Precision tube, high-pressure grouting pipe, pipe shed pipe, grouting pipe factory, high price, service, on-site settlement and honest management! The purpose of grouting is to prevent seepage, stop leakage, strengthen and correct the deflection of buildings.● features: the grouting pipe is divided into secondary grouting pipe (ccll-y grouting pipe, qdm-it grouting pipe, and price merchants follow up in the Mongolian circle' >
Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method ccll-d full section grouting pipe)
Send a message
- Views:32 Times