Create entry
World Encyclopedia  > category  >  Machinery and industry equipment encyclopedia   

zabul Design of boarding bridgeProduction process

release time: 2024-04-19 04:45:37

sometimes poor hydraulic oil can also cause noise on the hydraulic boarding bridge

Slowly reverse and park the container under the lip at the front of the boarding bridge.When replacing hydraulic oil, as well as noise when the pump station enters the air.zabul ,The emergence of mobile boarding bridges solves the problem of cargo loading and unloading auxiliary boarding equipment for forklifts entering the ground of freight containers and the height difference between trucks. The mobile boarding bridge can adjust the height of the mobile boarding bridge to be level with the height of the container according to the height of the truck container, achieving rapid loading and unloading of goods and improving the efficiency of cargo loading and unloading. So, what are the abnormalities that can be observed during the use of the mobile boarding bridge?The width of the boarding bridge also requires a certain width of its own. However, if the width is too small, it is not conducive to forklift loading and unloading of goods. If the width is too large, it can occupy a certain space, which is not necessary. So a reasonable width is necessary, usually the width of the electric hydraulic boarding bridge is mm, mm, and mm. The width of the bridge is divided into internal width and total width. As we have already mentioned, the internal width is the width of the passage, and the total width mainly refers to the width of the guardrails on both sides plus the width of the passage. The total width can be ignored in use, but everyone still cares about the internal width, which is the width of the channel.Eravur TownReasons for the hydraulic boarding bridge lifting platform not lifting: low voltage, motor not rotating, motor reverse, motor phase loss (motor not moving and buzzing), indicator light on, press the up button, motor rotates but lifting platform does not rise, lowering valve is open, overflow valve pressure is low, oil level is too low, oil pump is empty, oil suction filter is blocked, oil suction section is leaking, and two phases in the three-phase line are arbitrarily changed; Solution: Check the starter potential during motor load operation. Voltage hydraulic range allowed± 10%; Check the motor and circuit; Check the circuit breaker and motor wiring; When the lowering button is released, use a voltmeter to check whether the lowering valve is energized. If there is no power, check the circuit and eliminate the fault; If there is electricity, eliminate the malfunction of the lowering valve itself. The slide valve of the lowering valve must be kept clean and move flexibly. Readjust the overflow valve. Adjust at % rated load; Fill up the hydraulic oil; Clean the filter; Check the oil suction pipe and joints; Tighten the joint and replace it if necessary.During the application process of hydraulic boarding bridges, it is necessary to follow the operating procedures to ensure the normal operation of the equipment. What precautions should we take when using hydraulic boarding bridges?The slope of the electric hydraulic boarding bridge itself must have a certain slope to allow the forklift to enter the carriage for cargo loading and unloading. The length of the slope also varies from mm to mm, the manufacturer of the boarding axle has no turnover to avoid the price difference, which is % higher than the market value! More than one ton is more expensive!


zabul Design of boarding bridgeProduction process



What are the issues to pay attention to when using the boarding bridge? For example, mobile boarding bridges are generally used outdoors, and after use, they are also placed outdoors. They are often exposed to wind, rain, and sunlight, cover the boarding bridge with a rain cloth to prevent rusting and aging.Mobile boarding bridge is a cargo loading and unloading auxiliary equipment used in conjunction with forklifts,zabul Manufacturing of boarding bridges, which can adjust the height according to the height of the car carriage. Forklifts can directly enter the interior of the carriage for batch loading and unloading of goods, and can achieve rapid loading and unloading of goods with only one person working. It enables enterprises to reduce a large amount of labor, improve work efficiency and obtain greater economic benefits.Open planning before placement makes it easy to clean up clutter.Project scope, which can effectively prevent the adjustment board from falling down and keep the pressure foot in a safe state.  . Before use, check the boarding bridge for obvious damage such as cracks and broken wires.Embedded boarding bridge, as the name suggests, refers to the boarding bridge embedded in the loading and unloading operation platform. The installed boarding bridge main board surface is horizontal with the upper plane of the loading and unloading operation platform. Completely integrated into the platform, it will not affect other operational tasks on the platform without loading and unloading operations. The boarding bridge with this type of structure is widely used and is also a relatively fast boarding auxiliary device. Its design is usually fully standardized as early as the structural design of buildings. We are a long-term manufacturer of boarding bridges. Welcome to inquire


zabul Design of boarding bridgeProduction process



Connection for. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations.Executive standard,To ensure that the hydraulic boarding bridge is in good condition, it should be checked in advance before use, mainly including whether the buttons are effective; Whether the power cord and socket are intact; Whether the oil pipeline is intact; The stability of the guardrail; The tightness of bolts at each junction point; The appearance quality is intact. But when the power is turned on and the indicator light is on press the up button, the motor rotates but the lifting table does not rise. This may be due to the reverse connection of the three-phase power supply and the motor reversing. Only the power supply needs to be corrected, so it is not a major problem.The seat belt needs to be inspected every six months, with a load of kilograms. The test time is five minutes. After the test, check whether the seat belt is broken or deformed,zabul Aluminum alloy boarding bridge, and keep records of the experiment. Any unqualified seat belts should be immediately stopped from use. Long term promotion of various brand products such as axle manufacturers, with complete designated products and guaranteed qualityIt is strictly prohibited to apply excessive pile loads around the foundation pit.zabul ,Open planning before placement makes it easy to clean up clutter.The hydraulic boarding bridge not only reduces labor intensity, but also doubles the efficiency of loading and unloading operations, accelerates logistics speed, and achieves significant economic benefits. Hydraulic loading and unloading bridge is a specialized auxiliary equipment for fast loading and unloading of goods. Its height adjustment function allows a bridge to be built between the truck and the cargo platform in the warehouse. Forklifts and other transport vehicles can directly enter the truck for batch loading and unloading of goods, also known as loading and unloading platforms.Hydraulic boarding bridges should strictly adhere to the principle of being overweight, as overloading may cause damage to objects; Working on a lifting platform without protective barriers may cause personnel to fall and cause casualties.


Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms